My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00267
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00267
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:13:29 PM
Creation date
10/11/2006 9:36:51 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8542
Description
Conejos Division - Platoro
State
CO
Basin
Rio Grande
Water Division
3
Date
4/1/1981
Title
SAFETY OF DAMS - Standing Operating Procedures for Platoro Dam and Reservoir - San Luis Valley Project
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,. <br /> <br />3. FLOODING <br /> <br />C'J <br />00 <br />C~ If a situation develops at the reservoir whereby flooding above normal <br />".J <br />'-....' water surface elevation of 10,027.5 feet appears imminent, immediately <br />(:) <br /> <br />contact the Chama Field Division and/or the URGBP office. Information <br /> <br />to be reported should include: <br /> <br />a. Current reservoir water surface elevation; <br /> <br />b. Observed rise rate of the water surface; <br /> <br />c. Weather conditions in the vicinity--past, present, and <br /> <br />predicted; and <br /> <br />d. The discharge conditions upstream and downstream from the <br /> <br />reservoir, and <br /> <br />e. The discharge conditions at Mogote, San Antonio, and <br /> <br />Lasauses gaging stations. <br /> <br />Flow releases through the outlet works and storage in the reservoir <br /> <br />during flood periods are made as instructed by the Corps of Engineers <br /> <br />as provided in the "Platoro Reservoir Flood Control Regulations Manual" <br /> <br />unless safety of the structure required additional releases as <br /> <br />determined by the projects office. <br /> <br />~. <br /> <br />The plan of regulation of flood control requires that the reservoir be <br /> <br />operated in such a manner as to control, insofar as possible, the flow <br /> <br />A-13 <br /> <br /><.>, <br /> <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.