My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00267
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00267
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:13:29 PM
Creation date
10/11/2006 9:36:51 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8542
Description
Conejos Division - Platoro
State
CO
Basin
Rio Grande
Water Division
3
Date
4/1/1981
Title
SAFETY OF DAMS - Standing Operating Procedures for Platoro Dam and Reservoir - San Luis Valley Project
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />i:."- <br /> <br />~ offices and (2) Corps of Engineers, Albuquerque District. . <br /> <br />b. The URGBP office will inform (1) other Water and Power <br /> <br />',.:.". <br /> <br />C'J <br />C.l <br /> <br />.....,) <br /> <br />c:.) <br /> <br />c. The chama Field Division office will implement all possible <br /> <br />efforts to reduce or minimize resultant downstream flood. <br /> <br />d. The Chama Field Division office will corrdinate efforts with <br /> <br />sheriff's office or civil defense in alerting all downstream areas. <br /> <br />NOTE: Dam-tending personnel must be knowledgeable regarding what <br /> <br />constitutes "impending failure" of the dam. A false alarm causing panic <br /> <br />and possible loss of life during evacuation would be a mistake--no alarm <br /> <br />with subsequent failure of the dam would be a greater mistake. <br /> <br />Notification to the Sheriff's office of possible flooding downstream <br /> <br />should be made as early as possible; make certain all officials <br /> <br />understand the situation and the questionability of failure. <br /> <br />The Dam Tender will contact the URGBP office or other Water and POwer <br /> <br />offices, as available, for an evaluation of the dam failure potential. <br /> <br />Determine during this contact what additional immediate actions must <br /> <br />be taken to reduce the risk of failure and what other actions are <br /> <br />necessary. <br /> <br />A-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.