<br />, . <br /> <br />ijOl~~3 <br /> <br />. <br /> <br />. <br /> <br />Plan formulation studies, water supply studies, geologic investiga- <br /> <br />tions, engineering surveys, and preparation of the plan formulation appen- <br /> <br />dix are in progress on the BLUESTONE PROJECT. Foundation explorations <br />were completed at the Una damsite. Funds contributed by the Colorado <br /> <br />River Water Conservation District were used to expedite this drilling. <br /> <br />A proposed feasibility report is scheduled for completion in the middle <br />of fiscal year 1968. <br />On the GRAND MESA PROJECT, water supply studies and plan formulation <br />studies are in progress. Completion of aerial topographic maps of the <br /> <br />Electric Mountain Service Canal by private contract is approximately 85 <br /> <br />percent complete. A proposed feasibility report is scheduled for comple- <br /> <br />tion by the end of fiscal year 1968. <br />Feasibility investigations are continuing on the UPPER GUNNISON <br />PROJECT, consisting of plan formulation studies and water supply studies. <br />A proposed feasibility report is scheduled for completion in fiscal year <br />1969. <br /> <br />Preparation of design data for all project canals and laterals, <br /> <br />water supply studies, geologic investigations, and preparation of the <br /> <br />Operation, Maintenance, and Replacement Appendix are in progress on the <br /> <br /> <br />YELLOW JACKET PROJECT. A proposed feasibility report is scheduled for <br /> <br /> <br />completion by the end of fiscal year 1967. <br /> <br />Advance Planning <br /> <br />On the FRUITLAND MESA PROJECT the aerial mapping of the project area <br />by private contract has been completed. Advance planning studies are <br /> <br />well underway consisting of reanalysis of feasibility report data on <br /> <br />7 <br />