My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00246
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00246
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 7:09:35 AM
Creation date
10/11/2006 9:36:24 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8027
Description
Section D General Correspondence - Federal Agencies (Alpha, not Basin Related)
State
CO
Date
6/27/1966
Author
F M Clinton
Title
U S Dept of Interior - Bur of Reclam - Region 4 - Corres. Reports - 1965-1966 - Report by the Bureau of Reclamation, Region 4, to the Colorado Water Conservation Board
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, . <br /> <br />ObiG9~ <br /> <br />. <br /> <br />. <br /> <br />water supply, agricultural economy, land classification, drainage, repay- <br /> <br />ment studies, and cost estimates. Classification of additional lands <br /> <br />, W <br />resulting from realignment of the FrultlandfCanal has been completed. <br /> <br />Foundation explorations have been completed at outlet portal and are in <br /> <br />progress at the inlet portal of the Black Mesa Tunnel, A definite plan <br /> <br />report is scheduled for completion in the middle of fiscal year 1967. <br /> <br />Advance planning studies on the SAVERY-POT HOOK PROJECT consisting <br /> <br />of land classification, drainage investigations, water supply studies, <br />;,4 <br />",. and geologic investigations have been undertaken in fiscal year 1966, <br /> <br />Foundation drilling completed early in the year verified the Savery dam- <br /> <br />site to be acceptable geologically, Foundation explorations have also <br /> <br />been completed at the inlet and outlet portals of the tunnel to divert <br /> <br />from Pot Hook Reservoir to the Pot Hook Canal. A definite plan report <br /> <br />is scheduled for completion in fiscal year 1969, <br /> <br />Small Reclamation Projects Pro~ram <br /> <br />The ORCHARD CITY IRRIGATION DISTRICT PROJECT is ready for service <br /> <br />this irrigation season. <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.