Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />002732 <br /> <br />force and effect as if included in this Act". The Colorado <br />River Floodway Task Force, of which FEMA is a member, has <br />established, in working with the Bureau of Reclamation, the <br />technical methodology to be used in determining the <br />boundaries of the Floodway. The Floodway elevations have <br />been determined and delineated in accordance with the <br />recommended methodology. This is considered by FEMA to be 0'#0 <br />the best Floodway technical information available and is <br />being used for planning purposes by local entities in advance <br />of the formal F100dway map adoptions by FEMA. However, for <br />the purposes of the National Flood Insurance Program, the <br />Floodway maps must first be formally adopted by FEMA. <br /> <br />The time period for formal adoption by FEMA of the <br />Colorado River Floodway maps and provisions, prepared \ . ( <br />pursuant to the Colorado River Floodway Protection Act, could ~~ )o:r <br /> <br />,~l~:~'-~~don~?~~: ::~~~le;,~~i Is:~~~t ~~:;~~9'~~:~~~~'=::~~~~~~] ~~:"\\:: 1: <br /> <br />c,e,r:Ii..i,'~il:.<;:a,"J.-_0n,'Of_.F-1OO<!l'Way c, oncrioj;101'1s-a,nd-da_t, a,_be:t,w"e, e,n" t,He ~'> ~o I-d.J. <br />Burce,aILoL-_Reclamati-on,,-and FEMA_aRid.,:the-_ exch-anglLof-~Qor~~ng -\ \r/"~';f'I~~ <br />Rloodway:com.pu:tat-i-0n,al--datal" ThIS could reduce the perIod \\.,,,,~G <br />for FEMA's formal adoption of the Colorado River Floodway to " <br />about .six months, and possibly less for priority reaches of ~I <br />the nver. ) ~ <br /> <br />Delays in establishing the Colorado River Floodway ~r ~ . (1" <br />adversely affecting community development plans and propert kd ~ <br />owners along the River with regard to approval for 01 <~ J. <br />improvements. ~ It ~ <br /> <br />The Senate and House reports on the Colorado River ~~ 1 ct <br />Floodway Protection Act stated, in discussing Section 14 of d Q) 'Jt '<l <br />the Act, that the Department of the Interior, in carrying out , - ID <br />its responsibilities under the Act, should work closely and r.4 ~ <br />on a cooperative basis with representatives of the Federa16,O' Q' ~ <br />Emergency Management Agency (FEMA) to ensure that existing,", '~ <br />programs, such as the National Flood Insurance Program, can ~..:. <br />be supplemented as inexpensively and effectively as possible. ~ ~~ <br /> <br />RECOMMENDATION <br /> <br /> <br />It is recommended that, at the earliest possible date, <br />after final delineation of the Floodway boundaries by the <br />Secretary of the Interior, the Bureau of Reclamation and the <br />Federal Emergency Management Agency (FEMA), by letter.1<- <br />agreement, establish and implement means by which FEMA can <br />most expeditiously and economically incorporate the <br />provisions and maps of the Colorado River Floodway into the <br />National Flood Insurance Program. <br /> <br />III-3 <br />