My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC07461
CWCB
>
Water Supply Protection
>
Backfile
>
19000-19999
>
WSPC07461
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:11:06 PM
Creation date
10/9/2006 6:29:13 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106.A.1.c
Description
Colorado River Water Projects - Animas La Plata - Description - Construction - Durango Pump Station
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
10/7/2002
Author
DOI-BOR
Title
Durango Pumping Plant - Stage I - Project Specifications - Volume III-A
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />002261 <br /> <br />Durango Pumoing Plant - Staee I <br /> <br />D. Updated Schedule: <br /> <br />I. For approval. <br /> <br />2. Include: <br /> <br />a. Construction Program database with updated activity and milestone data. <br /> <br />I) Furnish data on 3.5-inch, double-sided, high-density floppy <br />diskette, ffiM compatible formatted; or 74 min/650 MB CD-ROM <br />disc. <br /> <br />2) Furnish database files in format compatible with Primavera Project <br />Planner, Version 3.0 or higher. <br /> <br />DefInition of workday calendars. <br /> <br />Bar chart for project or bar charts for each subnetwork. <br /> <br />Narrative report specifically stating status of project in terms of total float. <br /> <br />I) If negative float exists, cite specific actions and conditions which <br />caused the "behind schedule" condition and provide proposed <br />course of action to complete the project within the specified <br />delivery time. <br /> <br />2) List of Contractor-initiated changes to the current schedule stating <br />the reason for the action taken and any unresolved issues relating to <br />the Construction Program. Government reserves the right to reject <br />Contractor-initiated changes to the current schedule which <br />negatively impact any Government action which was initiated on <br />the basis of the current schedule. <br /> <br />2) Furnish database files in fonnat compatible with Primavera Project <br />Planner, Version 3.0 or higher. <br /> <br />b. Definition of workday calendars. <br /> <br />c. Bar chart for project or bar charts for each subnetwork. <br /> <br />d. Activity report including all logic constraints. <br /> <br />e. RSN submittal register. <br /> <br />f. Table listing equipment, manpower, and material limitations used to <br />produce baseline schedule. This listing may be independent of the <br />schedule database. <br /> <br />b. <br /> <br />c. <br /> <br />d. <br /> <br />E, Time Impact Analysis: <br /> <br />I. For approval. <br /> <br />2. Include: <br /> <br />a. Construction Program database with proposed revised activity and <br />milestone data. <br /> <br />Construction Program <br />01321 - 2 <br /> <br />( <br />
The URL can be used to link to this page
Your browser does not support the video tag.