Description
Colorado River Water Projects - Animas La Plata - Description - Construction - Durango Pump Station
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
10/7/2002
Author
DOI-BOR
Title
Durango Pumping Plant - Stage I - Project Specifications - Volume III-A
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />O1l22G1 <br /> <br />Durango Pumoing Plant - Stage I <br /> <br />SECTION 01321 - CONSTRUCTION PROGRAM <br /> <br />I <br /> <br />PART 1 <br /> <br />GENERAL <br /> <br />1.01 COST <br /> <br />A. Developing Baseline Schedule: Include cost in lump sum price offered in the schedule <br />for mobilization and preparatory work. <br /> <br />B. Updating and Using Construction Program: Include cost as an element of Contractor's <br />overhead. <br /> <br />1.02 REFERENCES <br /> <br />A. Associated General Contractors of America (AGe) <br />I. AGC Manual Construction Plarming and Scheduling Manual, 1997. <br /> <br />1.03 DEFINITIONS <br /> <br />A. Schedule: The Critical Path Method of planning and scheduling a construction project <br />where activities are arranged based on activity relationships and network calculations <br />determine when activities can be performed and the critical path of the project. <br /> <br />B. Project Calendar: Cross reference of numerical work days with calendar days. The <br />project calendar serves as the basis for the day/date conversion and assigns work days, <br />rest days, and holidays. <br /> <br />C. Resources: Equipment, labor or crews, materials, subcontractors, fabricators, <br />manufacturers, and consultants. <br /> <br />1.04 SUBMITTALS <br /> <br />A. Submit the following in accordance with Section 01330 - Submittals. <br /> <br />B. Representative Information: Designation of authorized representative to coordinate with <br />Contracting Officer to develop and maintain Construction Program. <br /> <br />C. Baseline Schedule: <br /> <br />I. For approval. <br /> <br />2. Include: <br /> <br />a. Construction Program database with activity and milestone data. <br /> <br />I) Furnish data on 3.5-inch, double-sided, high-density floppy <br />diskette, IBM compatible formatted; or 74 min/650 MB CD-ROM <br />disc. <br /> <br />Construction Program <br />01321. I <br />
The URL can be used to link to this page
Your browser does not support the video tag.