Laserfiche WebLink
<br />002258 <br />Durango Pumoing Plant - Stage 1 <br /> <br />E. Government land {as shown on drawings} may be used for required construction <br />facilities. <br /> <br />F. When private land is used for construction facilities, or other construction purposes, make <br />necessary arrangements associated with use of private land. <br /> <br />G. Location, construction, operation, maintenance, and removal of construction facilities on <br />Government land will be subject to approval of the Contracting Officer. <br /> <br />H. Do not interfere with work of other contractors or the Government in vicinity, or with <br />reservations made by the Government for use of such land. <br /> <br />I. Housing for construction personnel will not be permitted on Government land, except <br />housing for guards or watchmen as may be approved by the Contracting Officer. <br /> <br />J. Provide Department of Energy (DOE) and Colorado Department of Health and <br />Environment (CDPHE) and their contractors' access to the site during construction for <br />the purpose of sampling and testing existing ground water monitoring wells. <br /> <br />PART 2 <br /> <br />PRODUCTS <br /> <br />Not Used <br /> <br />I <br /> <br />PART 3 <br /> <br />EXECUTION <br /> <br />3.01 RESTORATION <br /> <br />A. Restore temporary construction roads to original contours and make impassable to <br />vehicular traffic when no longer required. <br /> <br />B. Scarify and regrade, after completion of work, Government land used for construction <br />purposes and not required for future construction so that surfaces blend with natural <br />terrain and are in a condition that will facilitate natural revegetation, provide proper <br />drainage, and prevent erosion. <br /> <br />END OF SECTION <br /> <br />Use of Site <br />01141 - 3 <br />