Laserfiche WebLink
<br /> <br />; <br /> <br />. <br /> <br /> <br />. <br /> <br />- 9 - <br /> <br />to capture, reoapture, use and reuse the said added supply so often and as it <br /> <br />may appear at the stream intake headgates of aqueducts and reservoirs serving <br />lands within said Distriot. <br />The United Stetes does not abandon or relinquish any of the increment <br />or seepage or return flow water coming from the irrigetion of lands or other <br />uses supplied with water from or through the works constructed by the United <br />States, but that the same is reserved and intended to be retained. <br /> <br />GENERAL PHYSICAL DESCRIPTION <br /> <br />Claimants' water system, known as the Colorado-Big Thompson Projeot, <br />comprises an extensive system of diversion works, tunnels, oanals, conduits, <br />basins, pumping plants, hydro-electrio plants, and other structures for <br />impounding, diversion and use of water for said purposes, all initiated, con- <br /> <br />struoted and under process of construction, or contemplated for the diversion, <br /> <br />carriage and use of water by oanals, tunnels, conduits, dams, power plants <br /> <br />and basins for an entire, interconnected and inter-dependent water system. <br /> <br />The principel objectives of the projeot are to furnish supplemental <br />irrigation water to the lands of the Northern Colorado Water Conservanoy <br />District and to produce hydro-electrioal energy for the entire Rocky Mountein <br />area and in so doing prevent any losses of presently enjoyed rights of the <br />owners in the upper Colorado River Basin. The principal structures end their <br /> <br />functions in the project sre as follows: <br /> <br />1. Green Mountsin Reservoir (Sheet 1. Exhibit C). located in Summit <br />County. Colorsdo, is formed by a dam across,the Blue River. The normal high <br />water surface is elevation 7950.0 feet in the reservoir. Ths reservoir is <br />located in all or parts of Sections II, 12, 13, 14, 15 and 24, T. 2 S., R. 80 W., <br />and Secticns 17, 18, 19, 20, 21, 28, 29, 33 and 34, T. 2 S., R. 79 W. The <br />Green Mountain Dam, aoross the bed of the Blue River is located in Section 15, <br />T. 2 S., R. 80 w. The looat~on of the axis of the da~ is described as follows. <br /> <br />Starting at the Seotion co~er common to Sections I, 2, 11 and 12, <br /> <br /> <br />T. 2 S., R. 80 W., Sixth Principal Meridian Ststion 0 100 of the dam axis <br /> <br /> <br />bears S. 360 31' 45" w. a distance of 1l,lE5 feet. The bearing of the axis <br /> <br /> <br />is N. 210 00' 00" E. The length of the axis is 1100 feet on the crest. The <br /> <br />2656 <br />