Laserfiche WebLink
<br /> <br />, <br /> <br />. <br /> <br />, <br /> <br />. <br /> <br />. <br /> <br /> <br />- 5 - <br /> <br />Flatiron Penstook <br /> <br />Flatiron Power Plant <br /> <br />Flatiron Dam <br /> <br />Big Thompson Wasteway, <br /> <br />Penstook and Pow~r Plant <br /> <br />,10. The Foothills Reservoirs and Feeder Canale (Sheets 5, 6, 7, <br /> <br />Exhibit C) looated in Larimer County, Colorado, inolude Carter Lake Reservoir, <br /> <br />Dam and two dikes, qnd pressure tunnel, Flatiron Dam and Reservoir, Horsetooth <br /> <br />Feeder Canal end Horsetooth Reservoir with its dike snd four dams, whioh <br /> <br />structures will store and distribute projeot waters to the supply oanals for <br /> <br />delivery to the Northern Colorado Water Conservanoy District. <br />11. The Irrigation Supply Canals (Sheet 7, Exhibit C), looated in <br /> <br />Larimer, Boulder, and Weld Counties, will oonsist of the final delivery system <br /> <br />to the Caohe la Poudre, Little and Big Thompson Rivers, st. Vrain and Boulder <br /> <br />Creek, and South Platte River, as speoified by oontraot with the Northern <br /> <br />Colorado Water Conservanoy Distriot, and will inolude the Poudre Supply Canal, <br /> <br />the North Poudre Supply System. the St. Vrain Supply Canal, the Boulder Creek <br /> <br />Supply Canal, and the South Platte Supply Canal. <br /> <br />12. The necessary transmission lines and substations to advanta- <br />. ' <br /> <br />geously distribute the generated hydro-electrio power to the oonsumers. <br /> <br />The aforementioned works of the Colorado-3ig Thompson projeot are to <br /> <br />be oonstru.oted, <br /> <br />(8) For supplyinr, irri~stion water to spproxim.tely <br />615.000 acres of land in Northeastern Colorado. <br /> <br />(b) For 8 domestic water supply for cities and towns within <br />the area served. <br /> <br />(c) For the stabilization raplacement and regulation of the <br />water flow cf, and for irrigation on, the Colorado <br />River. <br /> <br />(d) For hydro-electrio power development, recreational and <br />industrial purposes on both sides of tho Continental <br />Divide. ' <br /> <br />Ths project will bring to ths farms, industries and cities within <br /> <br />the area to be ssrved a neoessary supply of watar for domestic, irrigationsl, <br /> <br />industrial, power and reoreational uses by means ohiefly of diversion on the <br /> <br />()~~~ <br />