My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC05153
CWCB
>
Water Supply Protection
>
Backfile
>
18000-18999
>
WSPC05153
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:42:32 AM
Creation date
10/9/2006 5:02:30 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106.A.1.c
Description
Colorado River Water Projects - Animas La Plata - Description - Construction - Durango Pump Station
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
10/7/2002
Author
DOI-BOR
Title
Durango Pumping Plant - Stage I - Project Specifications - Volume II
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />002089 <br /> <br />piping; furnishing and installing mechanical and electrical support systems, including piping and <br />high voltage equipment; furnishing and erecting an air chamber; constructing an access road and <br />service yard; and other associated work. <br /> <br />1. Technical proposal items: <br /> <br />(a) Site layout, including carpenter's yard, equipment delivery and materials <br />storage areas, and concrete batch plant location. <br /> <br />(b) Resume for concrete foreman demonstrating successful experience on similar <br />types of construction. <br /> <br />(c) Reinforced concrete fonning plans. <br /> <br />(d) Electrical subcontractor's experience. <br /> <br />(e) Mechanical subcontractor's experience. <br /> <br />(f) Main pump unit supplier. <br /> <br />(g) Main unit motor supplier. <br /> <br />(h) Pre-cast concrete supplier. <br /> <br />(i) Critical path method schedule including resources. <br /> <br />E. Ridges Basin Inlet Conduit, Stage 2. (Award approximately October 21,2005): <br />Construct the inlet conduit, including excavating pipe trench, laying large diameter pipe, <br />backfilling, and constructing the reservoir discharge structure. <br /> <br />1. Technical proposal items: <br /> <br />(a) Drilling and blasting subcontractor's experience. <br /> <br />(b) Test blast and typical trench production blast plan. <br /> <br />(c) Bar chart schedule with planned resources. <br /> <br />F. Other Contracts. There may be other smaller in magnitude construction contracts <br />required to complete the Animas-La Plata Project which will utilize this same agreement and <br />processes. <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.