My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC05153
CWCB
>
Water Supply Protection
>
Backfile
>
18000-18999
>
WSPC05153
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:42:32 AM
Creation date
10/9/2006 5:02:30 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106.A.1.c
Description
Colorado River Water Projects - Animas La Plata - Description - Construction - Durango Pump Station
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
10/7/2002
Author
DOI-BOR
Title
Durango Pumping Plant - Stage I - Project Specifications - Volume II
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />002088 <br /> <br />C. Ridges Basin Dam. (Award approximately June 3, 2003): Dam excavation, foundation <br />treatment, including grouting, tunnel excavation and lining, materials processing in borrow area <br />B, embankment construction, river diversion, dewatering, embankment slope protection, gate <br />chamber construction, electrical and mechanical work, outlet works and other appurtenant <br />structures construction, and Basin Creek improvements. <br /> <br />1. Technical proposal items: <br /> <br />(a) Materials handling plan, including excavation methods and sequences, <br />stockpile plan, Zone 1 moisture conditioning, slope protection installation <br />methods, borrow materials supply demands, and haul road locations and patterns. <br /> <br />(b) Dewatering specialists experience. <br /> <br />(c) Foundation dewatering plan. <br /> <br />(d) Grouting subcontractor's experience. <br /> <br />(e) Drin and blaster's experience. <br /> <br />(f) Test blast and typical production blast plan. <br /> <br />(g) RCC plant specifications (slope protection). <br /> <br />(h) Tunnel excavation subcontractor's experience. <br /> <br />(i) Excavation plan, including the sequence of construction for the gate chamber. <br /> <br />(j) Waste stockpile size and locations and haul roads and patterns. <br /> <br />(k) Materials handling plan for Borrow Area B, including plant layout, access, <br />stockpile size and locations, waste areas, and erosion provisions. <br /> <br />(I) Materials processing consultants experience. <br /> <br />(m) Materials processing plant specifications. <br /> <br />(n) Critical Path Method schedule, including resources. <br /> <br />D. Durango Pumping Plant, Stage 2. (Award approximately July 17, 2003): Constructing <br />the pumping plant substructure and super structure, including placement on reinforced cast-in- <br />place and precast concrete; furnishing and installing the main pumping units and manifold <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.