Laserfiche WebLink
<br />'1'> , ~ <br />,'I.:,022{s <br /> <br />2c4&2c5 <br /> <br />simulation of both scenarios. <br />Draft and final documentation of the subtask through modifications to the Phase II <br />documentation. <br /> <br />Cost Estimate: <br />Task 2cl 16 hours @ $82/hr = <br />Task 2c2 4 hours @ $ 82/hr = <br />Task 2c3 16 hours @ $ 82/hr= <br />Task 2c4 12 hours @ $ 82/hr= <br />Task 2c5 4 hours @ $ 82/hr= <br />Total Approximate Subtask Cost <br /> <br />$ 1310 <br />$ 330 <br />$ 1310 <br />$ 980 <br />$ 330 <br />$4,260 <br /> <br />Schedule: <br />Given Mr. Bethel's 20 hour per week time commitment to the CRDSS Project, it is <br />anticipated that the above work would be performed over the course of 3 weeks from April <br />7 through April 25. <br /> <br />Subtask LR-2d Revisions to Transmountain Diversions in Baseline Scenarios <br /> <br />Obiective: <br /> <br />It has been observed that future demands for transmountain diversions in the baseline <br />scenario may not have been consistently generated or adequately reflect current <br />concepts of use of these systems. Changes are necessary to improve the modeling <br />base. <br /> <br />Scope of Work <br />2d.1 Review the modeled demands, and modeled output for the transmountain diversions in the <br />baseline Colorado River scenario in light of historic records of diversions (assumed to be <br />readily available records from the CRDSS database). Generate recommendations for <br />suggested changes to the modeled transmountain demands to achieve consistency or the most <br />recent information available. Summarize the information gained on the demands and the <br />modeling change recommendations in a 5-6 page memo. <br />2d.2 In a 4 hour meeting with CRDSS management and/or CWCB staff, review and finalize <br />changes to be made to the modeled operation of each of the transmountain diversions in the <br />baseline scenario. <br />2d.3 Modify the model's input data (in the base model data directories on cando) to reflect the <br />agreed on changes to the modeling of the transmountain diversions in the baseline scenario. <br />It is anticipated that modifications to the statemod program would not be necessary. <br />2d.4 In draft form, modify (redline) existing Phase II documentation to reflect changes in <br />methodology, assumptions and results resulting from this task. <br />2d.5 After receiving CRDSS/CWCB comments of the draft task documentation, finalize the <br />modifications to the Phase II documentation to present the results of this task. <br /> <br />5 <br />