My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC04505
CWCB
>
Water Supply Protection
>
Backfile
>
16000-16999
>
WSPC04505
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:11:24 AM
Creation date
10/9/2006 4:38:49 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.700
Description
Colorado River-Colorado River Basin General Publications
State
CO
Date
11/15/1985
Title
CR Augmentation/Vegetative Management1986-88-Action Plan for Remand of NRDC Appeal-Proposed
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />Action <br />Item <br /> <br />Description of Task <br /> <br />H. Evaluate Ten Year Timber Sale fchedule. <br /> <br />1. <br /> <br />Using Stage II Analysis - tirrber <br />suitability (Item F-3 above) , <br />adjust Ten Year Tirrber Sale <br />Schedule to locations with higher <br />cost-efficiency (PNVl, in managing <br />for all multiple use benefits. <br /> <br />Who to <br />Accorrplish Time ~eeded <br /> <br />LMP staff, <br />TMstaff <br /> <br />2 weeks <br /> <br />I. Evaluate ASQ Level & Other Levels of Output as Appropriate. <br /> <br />1. <br /> <br />Evaluate/verify the appropriate <br />ASQ level for plan per iod <10 to <br />15 years); project future decodes. <br /> <br />2. <br /> <br />Verify the irrplen'€ntability of the <br />proposed ASQ levels, by period. <br /> <br />I}lP Staff, <br />TM staff <br /> <br />1 week <br /> <br />LMP Staff, 2 days <br />TM Staff, <br />Forest Engineer <br /> <br />3. Compare "ASQ" to previous average TM Staff <br />annual allowable harvest (AAH). <br /> <br />J. Evaluate Economic Tr'adeoff Analysis. <br /> <br />1. Verify validity of ~l #3, <br />,& nJaXimum PNV alternative. <br /> <br />1 day <br /> <br />LMP Staff, 1 week <br />ORAl <br />Economist <br /> <br />2. Revise Tradeoff Analysis & UolP Staff 1 week <br />displays in accordance with <br />WO 1920 letter dated 19 April 1985 - <br />"Economic Values & Tradeoff l\nalysis". <br />(Selected alternative only) <br /> <br />3. Include, as appropriate, a <br />discussion of the results of the <br />revised Tradeoff ~nalysis in the <br />revised ROO. <br /> <br />IMP Staff 1 day <br /> <br />,~,"I, . <br /> <br />'l,'" , <br /> <br />',j'';.. <br />, , <br />1,,; <br /> <br />~" <br />,! <br /> <br />~h <br />.':1~;'!,. <br /> <br />. <br /> <br />" <br /> <br />" <br /> <br />RCD <br />Revision <br />or <br />Plan Irrpl. <br /> <br />ROO Rev. <br /> <br />HCD Rev. <br /> <br />RCD Fev. <br /> <br />ROD Rev. <br /> <br />RCD Rev. <br /> <br />ROO Rev. <br /> <br />RCD Rev. <br /> <br />,I.' <br />
The URL can be used to link to this page
Your browser does not support the video tag.