My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC04505
CWCB
>
Water Supply Protection
>
Backfile
>
16000-16999
>
WSPC04505
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:11:24 AM
Creation date
10/9/2006 4:38:49 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.700
Description
Colorado River-Colorado River Basin General Publications
State
CO
Date
11/15/1985
Title
CR Augmentation/Vegetative Management1986-88-Action Plan for Remand of NRDC Appeal-Proposed
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />f' <br /> <br />'} <br /> <br />. <br /> <br />. <br /> <br />.' <br /> <br />Action <br />Item <br /> <br />Description of Task <br /> <br />vlho to <br />AccoI1l?lish Ti.me <br /> <br />RCD <br />Revision <br />or <br />Needed Plan Irrpl. <br /> <br />F. Evaluate Cost Efficiency of Prescriptions <br /> <br />1. Determine the cost-effIciency of <br />the non-timber prescriptions (See <br />item Cll . <br /> <br />Economist, 1 I'leek <br />LMP Staff <br /> <br />ROO Rev. <br /> <br />2. Evaluate economic values & costs LMP Staff 1 week RCD Rev. <br /> used in existing prescription <br /> analysis (FORPLAN sensitivity analysis) . <br />3. Compare & evaluate relative cost - Economist, 2-3 days ROO Rev. <br /> efficiencies of timber and non- LMP Staff <br /> tinber prescriptions to produce <br /> non-timber benefits (objectives) . <br />4. Incorporate/consider cost Forest on-going Plan <br /> reduction-revenue enhancement Hgmt Team, Irrpl. <br /> studies into existing & additional TM staff, <br /> prescriptions. LMP staff <br /> <br />G. Stage II Tirrber Economic Suitability. <br /> 1. Renew existing Stage II LMP Staff, 2 days RCD Rev. <br /> Suitability analysls. Hlstaff <br /> 2. Supplement Stage II SUitability IHP Staff 2 days RQ) Rev. <br /> analysis with additional data 18'16 <br /> and/or FORPLAN runs, as needed. <br /> 3. Evaluate results of Stage II TM Staff, 3 days RCD Rev. <br /> SUitability analysis. LMP staff, <br /> Economist <br /> 4. Locate results of stage II TMstaff, on-going Plan <br /> Analysis by specific land LMP Staff Irrpl. <br /> units. <br /> 5. Incorporate consideration of T~l Staff, on-going Plan <br /> stage II analysls & spatial Forest Irrpl . <br /> locations ln adjustments of, and Engineer <br /> additions to, Ten Year Tinber <br /> Sale fchedule. <br /> <br />. ~~ <br /> <br />,j <br />
The URL can be used to link to this page
Your browser does not support the video tag.