My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC04041
CWCB
>
Water Supply Protection
>
Backfile
>
16000-16999
>
WSPC04041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:37:34 AM
Creation date
10/9/2006 4:21:56 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8272
Description
Colorado River - Colorado River Basin Salinity Control Program - CRBSCP
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
5/31/1994
Title
1993 Annual Report of the Colorado River Basin Salinity Control Program
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />OJO.,94 <br /> <br />1993 ANNUAL REPORT <br /> <br />. <br /> <br />Uinta Basin Unit. The Council is pleased that the Secretary of the Interior formally <br />submitted the completed planning report and fmal environmental impact statement on Stage I of <br />the Uinta Basin Unit to the Office of Management and Budget for advice and consideration. The <br />Council recommends that Interior continue its efforts to obtain authorization to construct the <br />unit. <br /> <br />San Juan River - Hammond Unit. The Council recommends that Reclamation issue the <br />DefInite Plan Report/EA for this unit and urges Reclamation to seek authorization to construct <br />the project. The Council looks forward to receipt of the planning report and environmental <br />assessment. <br /> <br />Price-San Rafael Rivers Unit. The Council urges completion of the fmal EIS. The <br />Council urges cooperative effort between Reclamation, ASCS, SCS, FWS, and EPA to fmaIize <br />the Planning Report/EIS and seek authorization for the Reclamation portion of the joint project. <br />. The Council also recommends that USDA, in coordination with State of Utah and the Forum, <br />develop a mutually acceptable means of handling the depletion charge required under the <br />provisions of the Upper Colorado River Basin Endangered Fist Species Recovery Implementation <br />Program. <br /> <br />Dolores Project. The Council is pleased with the completion of Reach I and 2 of the <br />Towaoc Canal and that construction has begun on the other salinity control features associated <br />with the Dolores Project. The Council urges Reclamation seek sufficient funding to complete <br />all of the salinity features of the project in 1994. <br /> <br />Glenwood-Dotsero Springs Unit. ,The Council urges Reclamation to continue to work <br />with the private sector to develop a feasible salinity control project for the removal of salt from <br />the saline springs around Glenwood Springs, Colorado. <br /> <br />. <br /> <br />COWRADO RIVER BASIN SAlJNJTY CONTROL ADVISORY COUNCIL <br /> <br />6 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.