Laserfiche WebLink
<br />, 0004'78 <br /> <br />- 6 - <br /> <br />TABLE 2 <br /> <br />Parcels <br />along the Mainstem Piedra River <br /> <br /> Net Diversion Annual Volume <br />Parcel Acreaqe Rate (efs) (acre-feet) <br />1 ,289 4.81 867 <br />2 40 0.67 110 (21. 9 acres pumped) <br />3 162 2.69 486 <br />4 -1:L 0.73 13.2 <br />TOTAL 535 8.90 1595 <br /> <br />tv. Devil Creek - The Tribe will receive an 1868 priority <br />date for 1 cfs of water subordinated to all rights adjudicated before 1976. <br />v. San Juan River - The Tribe will have a total diversion right <br />of 1,530 acre-ft per year. See Table 3 below. <br /> <br />TABLE 3 <br /> <br />Parcel <br /> <br />Net <br />Acreage <br /> <br />23 <br />29 <br />120 <br />338 <br />510 <br /> <br />Diversion <br />Rate (cfs) <br /> <br />0.38 <br />0.48 <br />2.00 <br />i:M <br />8.50 <br /> <br />Annual Volume <br />(acre-feet) <br /> <br />69 <br />87 <br />360 <br />1014 (86.4 acres pumped) <br />1530 <br /> <br />1 <br />2 <br />3 <br />.. 4. <br />TOTAL <br /> <br />vi. Round Meadow Creek - The Tribe will be given an <br /> <br />1868 priority date for a maximum total volume of 925 acre-ft per year. <br />vii. Cat Creek - The Tribe will be given an 1868 priority <br />date for a maximum total diversion of 1,371 acre-ft per year. <br /> <br />l. <br />