My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC03413
CWCB
>
Water Supply Protection
>
Backfile
>
15000-15999
>
WSPC03413
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:34:59 AM
Creation date
10/9/2006 3:55:00 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8064
Description
Federal Water Rights - Colorado Indian Negotiations
State
CO
Basin
Statewide
Date
3/28/1986
Author
Unknown
Title
Meeting of the Political Strategy Group - Presentation Materials
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />00C477 <br /> <br />- 5 - <br /> <br />TABLE 1 <br /> <br />Parcels <br />in the Florida Ba s in <br /> <br />Parcel <br /> <br />Net <br />Acreage <br /> <br />103 <br />86 <br />21 <br />38 <br />29 <br />25 <br />105 <br />57 <br />....ll <br />545 <br /> <br />Diversion <br />Rate (cfs) <br /> <br />1. 29 <br />1.08 <br />0.26 <br />0.48 <br />0.36 <br />0.31 <br />1. 31 <br />0.71 <br />1.01 <br />6.81 <br /> <br />Annual Volume <br />(acre-feet) <br /> <br />206 <br />172 <br />42 <br />76 <br />58 <br />50 <br />210 <br />114 <br />.ill. <br />1090 <br /> <br />4 <br />5 <br />6 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />TOTAL <br /> <br />For parcel 15, the parties agree that the Tribe may irrigate an additional <br />2.7 acres, for a total of 29 acres entitled to project water. <br /> <br />Water for parcels 4, 5, and 6 will be given an appropriation date of <br />186~ and a priority date of Tanuary 1,1976. Water for parcels 9,10, <br />11, 12, 13, and 14 will have a priority date of 1868 subordinated to all <br />rights with an adjudication date prior to 1976. <br />i1. Stollsteimer Creek - the Tribe shall receive an 1868 <br />storage right for Lake Capote for 1,850 acre-ft with no refill and a 1986 <br />right for one refill. An existing right for 530 acre-ft will be forfeited. <br />The Carruthers Ditch right for 2 cfs shall be removed from the abandonment <br />list and subordinated to all direct flow rights adjudicated before 1986. The <br />Tribe will retain its 3.5 cfs direct flow right with a priority of 1914 in <br />Washington Flats Ditch. An augmentation plan developed by Fairfield-Pagosa <br />is recognized. <br />111. Piedra River - Table 2 below illustrates the agreements <br />reached with respect to the Piedra River: <br /> <br />.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.