My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC03144
CWCB
>
Water Supply Protection
>
Backfile
>
15000-15999
>
WSPC03144
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:34:02 AM
Creation date
10/9/2006 3:46:12 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.200
Description
Colorado River Basin-Colorado River Computer Models-Colorado River Decision Support System
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
6/12/1996
Title
Boyle IIIa WRP Enhancement-Phase IIIa Scope of Services-Tasks 1-11-Draft
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />8. Statemod input files reflecting aggregated reservoir water rights aggregated into 10 classes, <br />9, A memorandum documenting the aggregated reservoirs/stock ponds and their associated <br />characteristics (location, area-capacity, evaPoration, decree weighted administration number, <br />target, and end-of-month content). <br /> <br />Subtask 2.12 Add Instream Flows <br /> <br />Objective: Add instream flow rights not included in Phase II to the model, <br /> <br />Assumption: Instream flow rights on the mainstem and tributaries explicitly modeled in Phase II <br />will have already been included in the Phase II model. This task pertains to instream <br />flow rights on tributaries which have been introduced into the model during Phase III. <br /> <br />Approach: <br />1. STATE: Identify all new tributaries that have been added to the model under Task 2,04 <br />Review the CWCB instream flow listing to determine whether instream flow rights exist on <br />these tributaries, It is anticipated that approximately 10 new instream flow water rights <br />would be added to the model under this task, <br />2. RTIWR: Modify the Phase III STATEMOD input files to incorporate new instream flow <br />reaches, <br />3. STATE: Prepare a brief Task Memorandum describing how the newly added instream flow <br />water rights are represented in the model. It is expected to be I or 2 pages in length, <br /> <br />Deliverables <br />1. List of instream information to be added to Phase II model <br />2. Modified Statemod input files to reflect new instream flows. <br />3. Task Memorandum, <br /> <br />Subtask 2.13 Base Flow Generation <br /> <br />Objective: For the White River Basin, generate the base flow hydrology after the inclusion of <br />aggregated irrigation structures, reservoirs/stock ponds, and instream flows, It is <br />assumed for budgeting purposes that most of the aggregated structures will be imposed <br />on the existing base flow network but that 10 additional baseftow points may be added, <br /> <br />Approach: ~ <br />1. RTIWR: Determine ctdbutary a~a< estimate average areal precipitation, and the <br />precipitation weighted area for each new base flow point (not to exceed 10). These areas <br />will be double planimetered by hand. <br />2, RTIWR: For each new base flow point being added to the network, check to see if a <br />significant stream flow gage (5 years within study period) exists within the tributary and add <br />the gage to the network. This includes filling missing data at the gage location using <br />common regression techniques, add the gage to the network and the gage data file. <br /> <br />Phase IlIa Scope of Services <br /> <br />1060 <br /> <br />A-20 <br /> <br />June 12, 1996 <br />
The URL can be used to link to this page
Your browser does not support the video tag.