My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC02841
CWCB
>
Water Supply Protection
>
Backfile
>
15000-15999
>
WSPC02841
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:32:47 AM
Creation date
10/9/2006 3:35:42 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8272
Description
Colorado River - Colorado River Basin Salinity Control Program - CRBSCP
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
9/1/1989
Author
DOI-BOR
Title
Office of the Inspector General Audit Report - Survey Report on the Review of the CRBSCP
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />OG2d9 <br /> <br />CONSTRUCTION <br /> <br />?aradox Valley <br /> <br />Crystal Geyser <br /> <br />Las Vegas Wash <br /> <br />Grand Valley <br /> <br />~tElmo Creek <br /> <br />Lower Gunnison, <br />Stage I <br /> <br />INVESTIGATION <br /> <br />LaVerkin Springs <br /> <br />LO\o1er Virgin <br />River <br /> <br />Glenwood-Dotsero <br />Springs <br /> <br />Price River <br /> <br />San Rafael River <br /> <br />BUREAU OF RECUllATION <br />COLORADO RIVER BASIN SALINITY CONTROL PROGRAM <br />AUTHORIZED TITLE II SALINITY CONTROL PROJECTS <br /> <br />Status of Pro1ect <br /> <br />Deep well injection facilities <br />under eonseruceion <br /> <br />Unit deauthorized in 1984 <br /> <br />One portion completed; balance <br />deferred because of local <br />opposition <br /> <br />Stage I completed; Stage II <br />under construction <br /> <br />Preconstruct ion activities <br />continue <br /> <br />Preconstruction activities <br />cont.inue <br /> <br />Deferred; no viable control <br />method identified <br /> <br />Deferred; no viable control <br />method identified <br /> <br />Deferred until a beneficial <br />use can be found to satisfy <br />state water laws <br /> <br />Irrigation control alternatives <br />being investigated <br /> <br />Irrigation control alternatives <br />being investigated <br /> <br />Direy Devil River Deferred; state would not commit <br />to grant a water use permit. <br /> <br />lICombined Price-San Rafael River projects <br /> <br />18 <br /> <br />?j,~~ <br /> <br />Tons of S..:t <br />Elimin..:ed <br />Annuallv <br /> <br />Construction ':0:. <br />Expended ?~o;~::e: <br />Through Th:o''':'~:"'. <br />SeDt 30 1987 2010 <br />(In Thousands) <br /> <br />o <br /> <br />$32.466 <br /> <br />o <br /> <br />107 <br /> <br />7,000 <br /> <br />8,201 <br /> <br />21 ,900 <br /> <br />54,182 <br /> <br />o <br /> <br />287 <br /> <br />o <br /> <br />o <br /> <br />$ 84,290 <br /> <br />o <br /> <br />2,782 <br /> <br />181.92- <br /> <br />21,53":' <br /> <br />27, :33 <br /> <br />0 0 .,-< <br /> ~~j <br />0 0 ~9 B-3 <br />0 0 <br /> <br />o <br /> <br />o <br /> <br />o <br /> <br />o <br /> <br />o <br /> <br />o <br /> <br />3' ,,- <br />i ,oJ...;.. <br /> <br />- <br />" <br />
The URL can be used to link to this page
Your browser does not support the video tag.