Laserfiche WebLink
<br />~cElmo Creek <br /> <br />Big Sandy River <br /> <br />Lower Gunnison <br /> <br />Uinta Basin <br /> <br />Colorado River <br />Indian Reser- <br />vation <br /> <br />002200 <br /> <br />?a~e <br /> <br />BUREAU OF RECLAMATION <br />COLORADO RIVER BASIN SALINITY CONTROL PRCGR&~ <br />AL~ORIZEO TITLE II SALINITY CONTROL PROJECTS <br /> <br />Status of Proiect <br /> <br />Tons of Sal t <br />Eliminated <br />Annuallv <br /> <br />Construction Cas:s <br />Expended ?rojec:ec <br />Through 7h:'o'.lg~ <br />Sect 30 1987 20:] <br />(In Thousands) <br /> <br />Construction of irrigation <br />control features was author- <br />ized by P.L. 98-569 <br /> <br />o <br /> <br />o <br /> <br />o <br /> <br />Draft planning report identi- <br />fies no viable concrol methods <br /> <br />o <br /> <br />o <br /> <br />o <br /> <br />Construction authorized by <br />P.L. 98-569 <br /> <br />o <br /> <br />o <br /> <br />o <br /> <br />Deferred; authorization of <br />the recommended alternative <br />was not sought by the Acting <br />Assistant Secretary-water <br />and Science <br /> <br />o <br /> <br />o <br /> <br />$22,552 <br /> <br />Deferred; no salinity control <br />needed. <br /> <br />o <br /> <br />G <br /> <br />o <br /> <br />Palo Verde Irri- Deferred; no viable control 0 0 0 <br />gat ion District method identified <br />\ <br />OTHER FEASIBILITY STUDIES AUTHORIZED <br />~eeker Dome Feasibility tests (weU pluggi:'1g) 48,000 " 0 0 <br /> ,.; <br /> successfully eliminated salt <br /> sources; no construction needed <br />Totals 76 900 S95 243 1/ $398;,~S <br /> <br />11 Almost 29,000 tons of salt was eliminated prior to the salinity cont"ol program. <br /> <br />11 As of September 30, 1987, rhe Bureau had expended an additional S~7 million from its <br />General Investigations Program on Title II salinity control investigations. <br /> <br />19 <br />