My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC02841
CWCB
>
Water Supply Protection
>
Backfile
>
15000-15999
>
WSPC02841
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:32:47 AM
Creation date
10/9/2006 3:35:42 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8272
Description
Colorado River - Colorado River Basin Salinity Control Program - CRBSCP
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
9/1/1989
Author
DOI-BOR
Title
Office of the Inspector General Audit Report - Survey Report on the Review of the CRBSCP
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.:. <br /> <br />APPENDI X 2 <br /> <br />BlJ!lEAlJ OF RECLAMATION <br />COI.OHAIlO !lIVEH BASIN SALINITY CaNTHal. PROGRAM <br />'1'11'LE I CONS1'RUCTION AND COST STATUS <br /> <br />Proqram Feature Authorized <br /> <br />Desalting Complex <br />Desalting Plant 1/ <br /> <br />Drainage Canal to Santa Clara <br />Slough <br />Main Outlet Drain Extension <br />Siphon <br />Acreage Reduction and Irri- <br />gation Efficiency Improve- <br />ment Program <br /> <br />Gila River Control Measures <br /> <br />~ <br /> <br />Total: Desalting Complex <br /> <br />Reject Stream Replacement <br />Studies <br />Coachella Canal Lining <br />Protective Well Field <br /> <br />Fish and wiidlife <br /> <br />Other Project Costs if <br />Totals <br /> <br />Status <br /> <br />72-million-gallon- <br />per-day plant to be <br />completed in 1991 <br />Completed <br /> <br />Completed <br /> <br />Nearly completed; <br />Objective of reduced <br />irrigation drainage <br />accomplished <br />Not viable; will not <br />be implemented <br /> <br />Completed <br /> <br />Completed <br />21 wells and asso- <br />ciated features com- <br />pleted; balance (14 <br />wells) to be completed <br />when rCCJlI i l'cd <br />Under construction <br />Facilities 1/ <br />Not applicable <br /> <br />1974 <br />Authorized <br />Cost <br />(In Thousands) <br /> <br />Jan. 1988 <br />Estimated <br />Cost <br />(In Thousands) <br /> <br />Expenditures <br />Through <br />Sept. 30. 1987 <br />(In Thousands) <br /> <br />I <br />, <br />d <br />C/' <br />l~ <br />~ <br />00 <br /> <br />$ 62,080 <br /> <br />$311,816 Y <br /> <br />$164,686 <br /> <br />15,370 <br /> <br />23,233 <br /> <br />23,233 <br /> <br />3,100 <br /> <br />2,968 <br /> <br />2,968 <br /> <br />12,500 <br /> <br />42,315 <br /> <br />39,018 <br /> <br />5,000 <br /> <br />7,488 <br /> <br />o <br /> <br />98,050 <br /> <br />387,820 <br /> <br />229,905 <br /> <br />2,000 <br /> <br />2,158 <br /> <br />2,158 <br /> <br />21,450 <br />34,000 <br /> <br />47,871 <br />31,704 <br /> <br />47,871 <br />19,572 <br /> <br />o <br /> <br />15,227 <br /> <br />9,541 <br /> <br />o <br />$155.500 <br /> <br />764 <br />$485.544 <br /> <br />3. 230 <br />$312.283 <br /> <br />1/Includes the cost of testing and research and of constructing the Yuma desalting test facility. <br />Ylncludes $59, T/5, 000 to allow for construction of the last 24-million-gallon-per-day increment of <br />the plant's designed 96-million-gallon-per-day capacity. <br />2/FeatlJres added by t.he 1'J1I0 amendment at the Colorado River Basin salinity Control Act. <br />ijNonreimbursa.ble general investigation costs, service facilities, dnd other consolidated expenditures <br />and credits. <br />
The URL can be used to link to this page
Your browser does not support the video tag.