<br />:fW! VIi! <br /> <br />Grande Transmountain Diversion. Plotting of the above information <br />.' <br />was continued during the month. <br /> <br />Water supply studies are in progress. <br /> <br />GENERAL <br /> <br />A general review and revision of the water supply studies, <br />as found necessary, for the whole of the Rio Grande Easin in Colorado <br />was in progress during the month. , Local municipal officials, co- <br />operating wfth the Project Office, initiated preliminary steps <br />to secure grants of temporary housing for project employees who <br />are veterans,. <br /> <br />t' <br />.~ <br /> <br />-, <br /> <br /> <br />t' <br />-I <br />',:J, <br />. I <br />JJ <br />~;-l <br />_1 <br /> <br />The Regional Director, Regional Counsel and Project Engineer, <br />wi th members of his staif. met with the Rio Grande Water Investigation <br />Assooiation on April 24, 1946, to discuss the Eureau plans for the <br />Rio Grande Division of the projeot., ' <br /> <br />On April 25. 1946, Regional Director Nelson. Regional Counsel <br />Baird, Project Engineer Forester, and members of his staff, met with <br />the Colorado ~/ater Conservation Board and the Board of Directors of <br />the Conejos Water Conservancy District in Alamosa to diseuse matters <br />relating to project development and to the Conejos Division. <br /> <br />r--1 <br />~_.:l <br />'\'" <br />f,-J <br />[-. <br /> <br />ORGANIZATION AND PERSOmlEL <br /> <br />The project forces during the month of April, 1946, were: <br /> <br />" <br /> <br />1 Projeot Engineer <br />3 Engineers, Field Engineering and Surveys <br />a Engineers, H;ydrologic <br />2 Engineers, Office Studies <br />3 Soils Technologists <br />,11 Engineering Aides <br />1 Chief Clerk <br />1 Personnel Clerk <br />1 Clerk (Accounting) <br />2 Clerk~Stenographers <br />1 Clerk-Typist <br />1 Agriculture Economist <br />9 Laborers <br /> <br />-3. <br />