Laserfiche WebLink
<br />~~'l 001770 <br /> <br />WEATHER <br /> <br />, <br />l <br />r <br />, <br />I <br /> <br />The wea~erwas generally good for field activities. Snowfall <br />in the Copejos River Canyon at times hampered highway relocation <br />surveys. The estimated run-off of the Conejos River and the Rio <br />Grande River is fax below normal, and a grave shortage in irrigation <br />supplies to the San Luis Valley is in prospect. Fields are un- <br />usually dry, for this season of the year and dust storms are fre- <br />qUent. <br /> <br />~S FOR COMING MONTH <br /> <br />Project activitiss during May will complete highw~ relocations <br />in the Conejos Division and field surveys.'will be centsred largely <br />on topographic mapping of the Gerrard Site; test well drilling in <br />the Closed Baein area will continue as will all water supply studies.' <br /> <br />~ <br /> <br />, <br /> <br />, j <br />I <br /> <br />dllJj~ <br />D. M. Forester ' <br />Project Engineer <br />Eureau of Reclamation <br /> <br />b <br /> <br />,~ <br /> <br />:~ <br /> <br />r <br />I <br />[ <br />; <br />I <br />I <br /> <br />f <br /> <br />i- <br />I, <br />