My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC02427
CWCB
>
Water Supply Protection
>
Backfile
>
14000-14999
>
WSPC02427
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:19:06 AM
Creation date
10/9/2006 3:22:46 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8062
Description
Federal Water Rights - Colorado Litigation - National Forest ISF Claims - Technical Sutdies
State
CO
Basin
Statewide
Date
4/1/1986
Author
Unknown
Title
Technical Studies - Forest Service Manual - Title 2500 - Watershed Management
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />0018J7 <br /> <br />2525.04 <br /> <br />. <br /> <br />TITLE 2500 - WATERSHED MANAGEMENT <br /> <br />e <br /> <br />2525.04 - Responsibilities <br /> <br />2525.04a - Regional Foresters. All Regional Foresters <br />shall establish Regional gUidelines for monitoring of soil <br />and water resources, and watershed conditions. Include <br />those guidelines in Regional and Forest plans. <br /> <br />2525.04b - Forest Supervisors. All Forest Supervisors <br />shall ensure the interdisciplinary development of a <br />monitoring plan, before monitoring begins. <br /> <br />2525.1 - Monitoring plan. The plan should include: <br /> <br />1. Clear statements of objective, including data <br />accuracy requirements, collecting procedures, and <br />analytical standards and procedures. <br /> <br />e <br /> <br />2. A list of selected projects to be monitored, <br />coordinated with monitoring needs specified in the Forest <br />and project plans. <br /> <br />. <br /> <br />3. The instrumentation, measurement, analysis, and <br />reporting program. <br /> <br />4. The general time schedule for implementation. <br /> <br />5. Provision for periodic evaluation of the monitoring <br />to determine if parameters measured and frequency of <br />sampling meet planned objectives. <br /> <br />6. A schedule for equipment maintenance. <br /> <br />7. Contingency plans in case of breakdown of instru- <br />mentation. <br /> <br />e <br /> <br />a. Instruction for reporting when data indicates major <br />deviation from standards. <br /> <br />e <br /> <br />9. Estimated yearly financial requirements. <br />10. Personnel needs and assignments. <br /> <br />. <br /> <br />*-FSM 3/86 AMEND 48-* <br /> <br />e <br />
The URL can be used to link to this page
Your browser does not support the video tag.