Laserfiche WebLink
<br />Clu122'2 <br /> <br />HYDROBASE Design <br /> <br />DWR staff has recently prepared a preliminary <br />design of a relational database that will incorporate <br />most, if not all, of the present data maintained by the <br />DWR, CRDSS consultants and representatives will <br />help refine this design over the next several months, <br /> <br />USBR's CRSM Porting <br /> <br />CWCB and DWR staff are currently converting the <br />USBR's Colorado River Simulation Model (CRSM) <br />from a mainframe environment to a personal <br />computer environment, The new USBR <br />replacement model for CRSM may not be available <br />in a timely fashion and the CRSM model may have <br />to be incorporated into CRDSS, <br /> <br />Other Model Review <br /> <br />CWCB and DWR staff have also invested <br />considerable time in the review of existing models <br />including the UBSR's AOP model (which we <br />anticipate incorporating into CRDSS), the USBR's <br />Hydrologic Information System, and the Gunnison <br />River Basin Model (under development for the <br />CWCB), This review will facilitate the design of <br />CRDSS interfaces and functionality, <br /> <br />CRDSS FUNDING (FROM CWCB CONSTRUCTION FUND): <br /> <br />1992 - Authorization of$362,000 was made to CWCB and DWR, <br /> <br />1993 - Authorizations included $ 1,420,400 for CRDSS development and $250,000 for <br />CWCB and SEa support ofCRDSS development for a total of$I,670,000.. The <br />State is purchasing approximately $ 150,000 ofhardwarelsoftware for the <br />consultant to use in CRDSS development as part of the $1,420,400 authorization, <br /> <br />1994 - Recently requested authorization of $ 1,744,000 for CRDSS development and <br />$250,000 for CWCB and SEa support ofCRDSS development for a total of <br />$1,994,000, The $ 1,744,000 compares favorably (less than) to the estimated <br />Year 2 Project development cost of$I,845,000 Project Cost indicated in the <br />feasibility study, <br /> <br />1995 - Authorization request will be made at end of 1994 for Year 3 of CRDSS <br />development. If using Feasibility Study cost estimates an Year 3 authorization of <br />$1,981,000 would be requested for CRDSS development. If added to the <br />$250,000 for CWCB and SEa support, the total requested authorization may <br />approximate $2,231,000, <br /> <br />1996 - Authorization request will be made at end of 1995 for Year 4 ofCRDSS <br />development, Ifusing Feasibility Study cost estimates an Year 3 authorization of <br /> <br />5 <br />