<br />v <br /> <br />5EP-14-1994 15'17 FROM RIUER5lDE TECHNOLOGY, INC <br /> <br />TO <br /> <br />13038664474275 P.08 <br /> <br />Task 1.14 . Consumptive Use (May 8. January 1; revised to May 8 . December 15) <br /> <br />1. Develop Design of CU Model (May S - July 31) <br /> <br />Undate Data List (Mav 8 - June 15) <br /> <br />. This task has been completed" and a list of the available data has been created. The linkage <br />from irrigated acreage to structure is to be provided by the State for between 4 to 7 <br />stI'\lCtures. The State has not indicated a date by which these data will be available. <br /> <br />DesilID Modelin~ Options (Mav 29 - July 10) <br /> <br />. This task has been completed. The State has been evaluating the first version of the CU <br />model. We had a meeting September I and will have another meeting September 15. As a <br />result of these meetings, some minor modifications to the modeling options may be required. <br /> <br />Design Intertaee Windows (June 12. July 31) <br /> <br />. The design of the intertace windows has been completed. <br /> <br />2. Develop OMI Procedures (July 10 - October 16) <br /> <br />. A set of tests of the datab~se access were conducted. Based on the results. RTi IS <br />implementing a set of low-level OMIs. <br /> <br />Imnlement OM! Software (July 10. Se.ptember 30: revised to July 10- October 30) <br /> <br />. This task will be delayed because it cannot get started until the low-level OMIs are <br />completed. RTi is coordinating the development of the low-level DMIs. and as soon as they <br />are available this task will be complete. The new completion date will be around late <br />October. <br /> <br />Test and Refine DMT Software (Sentember II - October 16. revised to October 24- <br />November 25) <br /> <br />. Following DM! implementation, the new dates for the testing will be from October 24 to <br />November 25. <br /> <br />3. Develop GUI (May 22 - Januaryi I; revised to May 22 - December 15) <br /> <br />Imnlernent OUl (May 29 - October 16) <br /> <br />. The visual data browser has been implemented and is currently being tested by the State. A <br />number of problems with the porting of the code to the SGI were encountered. but at this <br />point they have been salved. We anticipate that this task will be completed on time. <br /> <br />Test and refine GUT (October 2 ~ December 31. revised to October 15 - December 15) <br /> <br />. This task will be completed by December 15. <br /> <br />A2151J9JW <br /> <br />7 <br /> <br />1513 <br />