<br /> <br />SEP-14-1994 15:17 FROM RIVERSIDE TECHNOLOGY, INC <br /> <br />TO <br /> <br />13038664474275 P.07 <br /> <br />Task 1.11 - Big River Model Coordination (May 8 - January 15) <br /> <br />I. Monitor Status of USBR Work (May 8 - January 15) <br /> <br />. This is an ongoing task that will continue throughout Phase lIa. <br /> <br />Task 1.12 -Big River Model Prototyping (May IS - December 15) <br /> <br />1. Integrate the BRM Within CRDSS and Test Operation (July 5 - December 15) <br /> <br />. CRSM has been ported to CROSS. and testing and validation is in progress. <br /> <br />2. GUI Development (July 5 - December 15) <br /> <br />. GUI development is on hold until the AOP GUI has been completed in order to utilize much <br />of the AOP work in the CRSM auI. <br /> <br />3. Documentation (May 15 - December IS) <br /> <br />. The State has developed documentation to describe porting that has been performed. Work <br />on documentation will continue through December. <br /> <br />4. Verification of Prototype (July 5. November I) <br /> <br />. Verification is underway. <br /> <br />Task 1.13 - Annual Operating Plan Model (May 8 - December IS) <br /> <br />1. Develop Mockups for Screen Design in 24MSM (May 8 - June 30) <br /> <br />. Subtask 1 is complete. <br /> <br />2. Develop Prototype GUI for 24MSM (June IS - September I) <br /> <br />. The prototype was developed by the end of August and contained all of the features except <br />graphs. Marc Seteds worlcing on the graphs and expects to have a complete prototype by <br />September 16. <br /> <br />3. Finalize GUI for 24MSM and F"rmalize Data Transfer Process (September 1 - November 15) <br /> <br />. Subtask 3 will be complete by mid-November, as scheduled. <br /> <br />4. Develop Documentation for Implementation of 24MSM (September 1 - December 15) <br /> <br />. Subtask 4 is on schedule. <br /> <br />1514 <br /> <br />A;!'.5f19~ <br /> <br />6 <br />