My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC01895
CWCB
>
Water Supply Protection
>
Backfile
>
14000-14999
>
WSPC01895
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:15:05 AM
Creation date
10/9/2006 3:04:17 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.200
Description
Colorado River Basin-Colorado River Computer Models-Colorado River Decision Support System-Ray
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
9/14/1994
Title
Project Management-CRDSS Year 1 Tasks and Subtasks-Summary
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />/ <br /> <br />SEP-14-1994 15:16 FROM RIVERSIDE TECHNOLOGY,INC <br /> <br />TO <br /> <br />13038664474275 P.06 <br /> <br />i <br /> <br />8. Prepare Task Memorandum (DeCember I - January I) <br /> <br />. This task is 30% complete. Design documents have been prepared that will be included in <br />the final task memorandum. <br /> <br />Task 1.0.9 User Database (May 8 . January 1) <br /> <br />1. Develop User Data Access Procedures (May 8 - June 15) <br /> <br />. This task is 70% complete. Additional refinement and testing remains. <br /> <br />2. Populate the Database (May 15.. June 15) <br /> <br />. This task is essentially complete. <br /> <br />3. Review and Validate the Database (June I . July 1) <br /> <br />. This task is complete. <br /> <br />4. Establish Maintenance Procedures (July 1 - January I: revised to October I.. January I) <br /> <br />. No work has yet been .accomplished on this task; this task will begin in October and will be <br />completed on schedule. <br /> <br />5. Prepare Task Memorandum {December I - January 1) <br /> <br />. This task is 30% complete. Design documents and a user list have been prepared that will be <br />included in the task memorandum. <br /> <br />Task 1.10 Station Database (May 15 - January 1) <br /> <br />1. COOlinue Implementation of the Database StroClUre (May 15 - January 1) <br /> <br />. This task is complete. <br /> <br />2. Develop Station Data Access Procedures (May 15. October I) <br /> <br />. This task is 45% complete. Procedures for access of the State's data remain. <br /> <br />3. Prepare Task Memoralldum (October 2 - November I) <br /> <br />. This task is 30% complete. Design documents have been prepared that will be included in <br />the fmal task memorandum. <br /> <br />1515 <br /> <br />A"$ 09/94 <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.