My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC01895
CWCB
>
Water Supply Protection
>
Backfile
>
14000-14999
>
WSPC01895
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:15:05 AM
Creation date
10/9/2006 3:04:17 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.200
Description
Colorado River Basin-Colorado River Computer Models-Colorado River Decision Support System-Ray
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
9/14/1994
Title
Project Management-CRDSS Year 1 Tasks and Subtasks-Summary
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br />f <br /> <br />SEP-14-1994 1S'17 FROM RIVERSIDE TECHNOLOGY,INC <br /> <br />TO <br /> <br />13038664474275 P.09 <br /> <br />4. Develop Users' Manual (May 29 ~ January I; revised to May 29 - December 15) <br /> <br />First Oraft of User Oocuments ( Mav 29 - October 2) <br /> <br />. A number of task memoranda and Mosaic documents have been created. A draft of all <br />documents will be completed by October 2. <br /> <br />Final Version of User Documents (October 2 - December II) <br /> <br />. This task is expected to be completed on time. <br /> <br />5. Develop Technical Methods for Calculating Agricultural CU (May 8 - December I I) <br /> <br />Irriv.ted Acrealle (Mav 8. Julv 10) <br /> <br />. This task has been completed. There were some delays in obtaining the map, but everything <br />is on the system and completed. <br /> <br />Calculate Water Short Areas (Julv 3 - November 13: revi~ed to October 1 - November 13) <br /> <br />. At this point this task has not been started because the State needs to provide the information <br />that links diversion structures to irrigated areas. This task will take aboUl a month after the <br />information is available. If the State provides RTi the information prior to mid-October, <br />then this task will be completed on time. <br /> <br />Effecth.e Precipitation (Julv 3 - September III <br /> <br />. This task has been completed on time. <br /> <br />Locallv Calibrate SCS R.C (Julv 31 - November 13: revised to September 15 - November 13) <br /> <br />. This task is expected to be completed on lime. The task will actually only get started in mid- <br />September, but will be completed on time. <br /> <br />Incornorate Stored Soil Moisture (Julv 10- Auvust 7) <br /> <br />. The FORTRAN code has been modified to incorporate the soil moisture. In the CU meeting <br />with the Stale on September 15, we will be discussing if more refinements are required. For <br />now, one version is implemented. <br /> <br />Modifv XCONS2 Pro-vamtMay 8 - Julv 1m <br /> <br />. The XCONS2 program from the USBR has been modified and incorporated into the CROSS <br />CU model. <br /> <br />1512 <br /> <br />AZ7S 09JW <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.