<br />, <br />i <br /> <br />SEP-14-1994 15'19 FROM RIVERSIDE TECHNOLOGY,INC <br /> <br />TO <br /> <br />13038664474275 'P.12 <br /> <br />2. Initiate Data Collection Library (July I - December 15) <br /> <br />. RTi has continually been collecting water rights and policy data for the "library." Most of <br />the relevant data for the Gunnison basin has been acquired. RTi has prepared "draft" <br />narrative descriptions for the key operating rules and policies. . These are now ready for <br />internal review. It is estimated that this subtask is approximately 60% eomplete. <br /> <br />3. Review CRAM, Port Data and Constructs (July 1 - July 31; revised to July I - October 15) <br /> <br />. The review and understanding of the GUNMOD model is slightly behind schedule. Because <br />of the inability to meet directly with Hydrosphere until mid-August, the team bad to work on <br />its own, with assistance from Chuck Haines. The GUNMOD data have been ported to the <br />MODSIM environment, although it is now our understanding that Hydrosphere has made <br />modifications to some of the input data. On September 7, the CROSS team had its first <br />meeting with Hydrosphere and is now awaiting the detailed summaries of the network <br />constructs. Because understanding of the basic policies and administration of the Gunnison <br />basin is very dependent upon understanding and knowledge of the GUNMOD model, it is <br />estimated that this task is abollt 70% percent complete. <br /> <br />4. Develop MODSlM Prototype (June 15 - October I; revised to June 15 - October 15) <br /> <br />. The physieal network for the MODSIM model for the Gunnison River prototype is complete. <br />Work is continuing on the development of the more complex reservoir accounting links and <br />exchange links. Progress was slowed because of extra time being spent analyzing methods <br />to improve Ihe execution time and documenting the currenl slatus of the MODSIM model (as <br />requested by the State inCSU Subtask A). At this time.. additional information to be <br />provided by Hydrosphere is very important to completing the development of the reservoir <br />constructs and accounting links. It is estimated that this subtask is about 60% complete. <br /> <br />5. Perform Initial MODSIM Runs (August 22 - October 21) <br /> <br />. A number of test runs have been made for the physical network of the MODSIM model for <br />the Gunnison River basin. . Additional runs will be made as the accouAting links and <br />reservoir constructs are completed and implemented. It is estimated that this work is about <br />20% complete. <br /> <br />6. Calibrate MODSIM Model (August 14 . November 25; revised to September 19 - <br />November 25) <br /> <br />. No significant effort has been expended on this task. Given the development status of <br />Subtasks 3. 4, and 5, it is anticipated that the schedule for this subtask will end on time. <br /> <br />7. Develop DMIs for Demands (July 10 - September 1; revised to August 15. October 21) <br /> <br />. The development of the DM! for this task is now underway with the development of low- <br />level DM!s 10 access pertinent information from tbe database. Work on Ihis subrask is now <br />abol,lt 5% complete. <br /> <br />1509 <br /> <br />"''''..... <br /> <br />11 <br />