Laserfiche WebLink
<br />, <br /> <br />S~P-14-1994 lS:19 FROM RIUERSIDE TECHNOLOGY,INC <br /> <br />TO <br /> <br />13038664474275 P.13 <br /> <br />8. Develop DM1s for Inflows (July 10 - September I; revised to July 15 - November 4) <br /> <br />. The work for the virgin flow (inflows) DMI is underway. The USBR procedures for <br />development of virgin flowS have been reviewed and RTI has prepared draft design <br />documents for internal review. It is estimated that this subtask is about 20% complete. <br /> <br />9. Develop DMIs to Access Water Rights Database (July 17 - August 7; revised to August 15 - <br />Ocrober 21) <br /> <br />. This work will be combined with the work of Subtask 7 as a single DMI that will access <br />water rights data, aggregated as required, and incorporated into the "demand" DM!. The <br />initial work related ro methods for aggregation of water rights has been completed, and the <br />first draft of an aggregation DMI has becn given to the Stare. It is estimated that this subtask <br />is about 40% complete. <br /> <br />10. Determine Return Flows Using Glover (July 17 - August 28; revised to August 8 - October 7) <br /> <br />. Wheeler has performed a nUinber of hypothetical srudies to estimate the expected range of <br />return flows. The State has been requested to provide specific irrigated areas for 20 to 25 <br />key water right structures in the Gunnison River basin to assist in the analysis of return flow <br />patterns. This work item is approximately 50% complete. <br /> <br />11. Develop DMIs to Estimate Net Reservoir Evaporation (July I I - August 25; revised to July 11 - <br />October 9) <br /> <br />. The design document for this DM1 is complete. Final coding of the utility remains. This <br />subtask is about 70% complete. <br /> <br />v <br /> <br />12. Prepare Summary for Existing Interface (July 18 - November 30) <br /> <br />. Enhancement of the MODSIM interface is an ongoing process. Additional work bas been <br />performed in an effort to improve the execution time of the model runs. This ~ubtask is <br />estimated to be about 40% complete. <br /> <br />13. Document Comparison Between MODSIM and CRAM (October 10 - November 30) <br /> <br />. This work effort is scheduled to begin in October. <br /> <br />14. Perform Model Studies of Scenarios (October I - December 15) <br /> <br />. This work effort is scheduled'to begin in October. <br /> <br />IS. Prepare Fmal Task Memorandum (November 15 . December 15) <br /> <br />. This work effort is scheduled to begin in November. <br /> <br />1508 <br /> <br />"'""".... <br /> <br />12 <br />