My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC01704
CWCB
>
Water Supply Protection
>
Backfile
>
14000-14999
>
WSPC01704
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:13:40 AM
Creation date
10/9/2006 2:56:04 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
5000.375
Description
Flood Protection Section - Alamosa - Rio Grande Flood
State
CO
Basin
Rio Grande
Water Division
3
Date
8/8/1985
Author
CWCB - DODES
Title
Report on the Findings of a State Damage Survey Team on the Rio Grande Flood of June 8-14 1985 - Rio Grande and Alamosa Counties - Colorado - CWCB - DODES - Second Preliminary Draft
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />002184 <br /> <br />r <br />r <br />! <br /> <br />-" <br /> <br />i ~ <br /> <br />j: <br />, <br />~ <br />r <br /> <br />3, VEMA Damage Survey Report forms to be used to write up site specific <br />engineering scope of work and related costs. Copies of these <br />reports to be provided to the local governments. <br /> <br />" -4: Team-Chief wiil coordinat-e-participatfon <br />Engineers, Soil Conservation Service and <br />of team, If unavailable,findings of the <br />these agencies for their comments. <br /> <br />of U.S. Army Corps of <br />local government as members <br />team will be reviewed by <br /> <br />5. All surveys are to be completed, and turned into DODES with the <br />team's findings and recommendations not later than close of business <br />on 8 August 1985. <br /> <br />6, Expenses related to carrying out of this mission assignment to <br />include travel, lodging, meals and other miscellaneous expenses are <br />to be sent to DODES: attention Len Boulas for payment. <br /> <br />7. This mission assignment will terminate once all surveys are <br />completed and the team's findings are turned in. In no case will <br />this extend beyond the 12th of August, <br /> <br />8. It is essential that the team begin its work as soon as possible <br />upon receipt of this mission assignment, but in no case later than <br />30 July 1985. <br /> <br />9, Team schedules to be coordinated directly with the local governments <br />concerned thru the County Administrators of both counties, <br /> <br />cc: County Adminstrator, and Emergency Services Coordinator <br />Alamosa and Rio Grande Counties <br />City Manager - Alamosa <br />Lt, Bob Copley - CSP - Alamosa <br />Sue O'Brien, Office of the Governor <br />State Conservationist - SCS <br />District Engineer, Albuquerque District Corps of Engineers. <br /> <br />LAB/js <br />
The URL can be used to link to this page
Your browser does not support the video tag.