Laserfiche WebLink
<br />PRELIMINARY COST ESTIMATE FOR DEVELOPMENT <br />OF A COMBINATION OF ALTERNATIVES <br />FOR A MUNICIPAL WATER SUPPLY <br />FOR THE CITY OF GUNNISON, COLORADO <br /> <br />Item <br /> <br />Quantity Unit <br /> <br />Unit Price <br /> <br />Amount <br /> <br />1. Phase One Construction: <br /> <br />Resistivity or seismic survey <br /> <br />2 <br /> <br />miles $ 325.00 <br /> <br />$ <br /> <br />650.00 <br /> <br />Municipal Well No.8, <br />complete. <br /> <br />lump <br /> <br />21,800.00 <br /> <br />Municipal Well No.9, <br />complete. <br /> <br />lump <br /> <br />21,800.00 <br /> <br />8-inch pipelines from wells <br />to transmission pipeline. <br /> <br />4,000 <br /> <br />feet <br /> <br />14.00 56,000.00 <br /> <br />24-inch transmission pipeline <br />to distribution system. <br /> <br />6,700 <br /> <br />feet <br /> <br />40.00 268,000.00 <br /> <br />One million-gallon treated <br />water steel storage <br />reservoir including base. <br /> <br />lump <br /> <br />110,000.00 <br /> <br />10-inch pipeline from <br />reservoirs to distribution <br />sys tern. <br /> <br />1,500 <br /> <br />feet <br /> <br />16.00 <br /> <br />24,000.00 <br /> <br />Total Estimated Phase One Construction Cost................... $502,250.00' <br /> <br />2. Legal fees <br /> <br />25,100.00 <br />25,100.00 <br />50,200.00 <br /> <br />3. Bonding fees <br /> <br />4. Engineering and inspection fees <br /> <br />5. Contingencies <br /> <br />75,300.00 <br /> <br />Total Estimated Phase One Cost............................... $677,950.00 <br /> <br />-7- <br /> <br />000853 <br />