My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC01599
CWCB
>
Water Supply Protection
>
Backfile
>
14000-14999
>
WSPC01599
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:12:55 AM
Creation date
10/9/2006 2:51:11 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.761.09.C
Description
Colorado River-Federal Agencies-US NPS-Black Canyon of the Gunnison National Monument
Basin
Colorado Mainstem
Water Division
5
Date
2/18/1975
Author
CWCB
Title
Legislation to Make BC a National Park-Gunnison Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />PRELIMINARY COST ESTIMATE FOR DEVELOPMENT <br />OF A COMBINATION OF ALTERNATIVES <br />FOR A MUNICIPAL WATER SUPPLY <br />FOR THE CITY OF GUNNISON, COLORADO <br /> <br />Item <br /> <br />Quantity Unit <br /> <br />Unit Price <br /> <br />Amount <br /> <br />1. Phase One Construction: <br /> <br />Resistivity or seismic survey <br /> <br />2 <br /> <br />miles $ 325.00 <br /> <br />$ <br /> <br />650.00 <br /> <br />Municipal Well No.8, <br />complete. <br /> <br />lump <br /> <br />21,800.00 <br /> <br />Municipal Well No.9, <br />complete. <br /> <br />lump <br /> <br />21,800.00 <br /> <br />8-inch pipelines from wells <br />to transmission pipeline. <br /> <br />4,000 <br /> <br />feet <br /> <br />14.00 56,000.00 <br /> <br />24-inch transmission pipeline <br />to distribution system. <br /> <br />6,700 <br /> <br />feet <br /> <br />40.00 268,000.00 <br /> <br />One million-gallon treated <br />water steel storage <br />reservoir including base. <br /> <br />lump <br /> <br />110,000.00 <br /> <br />10-inch pipeline from <br />reservoirs to distribution <br />sys tern. <br /> <br />1,500 <br /> <br />feet <br /> <br />16.00 <br /> <br />24,000.00 <br /> <br />Total Estimated Phase One Construction Cost................... $502,250.00' <br /> <br />2. Legal fees <br /> <br />25,100.00 <br />25,100.00 <br />50,200.00 <br /> <br />3. Bonding fees <br /> <br />4. Engineering and inspection fees <br /> <br />5. Contingencies <br /> <br />75,300.00 <br /> <br />Total Estimated Phase One Cost............................... $677,950.00 <br /> <br />-7- <br /> <br />000853 <br />
The URL can be used to link to this page
Your browser does not support the video tag.