My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC01599
CWCB
>
Water Supply Protection
>
Backfile
>
14000-14999
>
WSPC01599
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:12:55 AM
Creation date
10/9/2006 2:51:11 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.761.09.C
Description
Colorado River-Federal Agencies-US NPS-Black Canyon of the Gunnison National Monument
Basin
Colorado Mainstem
Water Division
5
Date
2/18/1975
Author
CWCB
Title
Legislation to Make BC a National Park-Gunnison Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />PRELIMARY'OOST ESTIMATE (continued) <br /> <br />Item <br /> <br />Quantity <br /> <br />Unit <br /> <br />Unit price <br /> <br />Amount <br /> <br />. 6. Phase Two Construction: <br /> <br />'Intake improvements. <br /> <br />lump <br /> <br />$ 20,000.00 <br /> <br />24-inch raw water transmission <br />pipeline. 2,000 <br /> <br />feet <br /> <br />40.00 <br /> <br />80,000.00 <br /> <br />Sedimentation basin and <br />raw water reservoir. 180,000 <br /> <br />cu. yd. <br /> <br />2.50 <br /> <br />450,000.00 <br /> <br />4 m.g.d. treatment plant, <br />'complete. <br /> <br />lump <br /> <br />600,000.00 <br /> <br />24-inch treated water <br />transmission pipeline <br /> <br />2,000 <br /> <br />feet <br /> <br />40.00 <br /> <br />80,000.00 <br /> <br />Total Estimated Phase Two Construction Cost................. $1,230,000.00 <br /> <br />7. Treatment plant site <br />land acquisition <br /> <br />40 <br /> <br />acres 10,000.00 <br /> <br />400,000.00 <br /> <br />8. Lega 1 fees <br /> <br />61,500.00 <br /> <br />9. Bonding fees <br /> <br />61,500.00 <br />104,550.00 <br /> <br />10. Engineering and Inspection fees <br /> <br />11. Contingencies <br /> <br />184,500.00 <br /> <br />Total Estimated Phase T'NO COst.....,,'.............o.............$2,042.050.00 <br /> <br />Total Estimsced Project COst.................................$2,720,OOO.OO <br /> <br />-8- <br /> <br />00085~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.