My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC01478
CWCB
>
Water Supply Protection
>
Backfile
>
13000-13999
>
WSPC01478
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:12:06 AM
Creation date
10/9/2006 2:47:42 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.761.09.C
Description
Colorado River-Federal Agencies-US NPS-Black Canyon of the Gunnison National Monument
Basin
Colorado Mainstem
Water Division
5
Date
10/6/1992
Title
Legislation to Make BC a National Park-Briefing Paper-Draft
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />C. "Purpose and Needs Statement" . The "Purpose and Needs" statement is <br />portrayed as being very important in both potential challenges to any EIS <br />and alternative development. The "Need" statement must state clearly <br />what you are doing and why. A "Need Statement" should be only one or <br />two sentences and be specific. The purpose can expand on the "needs" <br />and be all encompassing. The need was stated as follows, "Provide a long <br />term water supply from the Wayne N. Aspinall Unit to the Black Canyon <br />of the Gunnison Natural Monument by means of a water service <br />contract." <br /> <br />The purpose will be as stated on the right hand side of page 1 of the <br />"Public Information Packet on the Proposed Contract to Deliver Water <br />from the Wayne N. Aspinall Unit to the Black Canyon of the Gunnison <br />National Monument", dated April 1992. The purposes will be expanded <br />as appropriate based on the public comments received. <br /> <br />D. Schedule - The Schedule for the balance of the NEPA process is <br />contained in the "Task Directive." The schedule will be revised to <br />encompass the USFWS five year interim test flow period. <br /> <br />IV. Draft Contract <br /> <br />The Preliminary Working Draft of the contract is dated January 15, 1992 and <br />will serve as the initial starting point from which contract negotiations will <br />proceed. <br /> <br />V. Endangered Species Act - Section 7 consultation on CRSP - Aspinall Unit <br /> <br />a. The USFWS entered into section 7 consultation on CRSP and the <br />Aspinall Unit pursuant to the Endangered Species Act by letter dated <br /> <br />9 <br /> <br />000994 <br />
The URL can be used to link to this page
Your browser does not support the video tag.