My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC01365
CWCB
>
Water Supply Protection
>
Backfile
>
13000-13999
>
WSPC01365
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:11:23 AM
Creation date
10/9/2006 2:44:57 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8541
Description
San Luis Valley Project
State
CO
Basin
Rio Grande
Water Division
3
Date
7/8/1975
Author
CWCB
Title
San Luis Valley Project Closed Basin Division - 1975 - Closed Basin Report - Statement for presentation to the Board of Directors of the Rio Grande Water Conservation District in Alamosa
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.... <br /> <br />0.0 0 612 <br /> <br />.. <br /> <br />. <br /> <br />Following completion of the pump testing and leaky aquifer testing we <br /> <br /> <br />will construct models of the system based on the information gathered in <br /> <br /> <br />the testing phase of the definite plan studies. We would hope to confirm <br /> <br /> <br />by these models the capacities and spacing of wells in the stage 1 <br /> <br /> <br />portion of the project. We will also construct a water quality model to <br /> <br /> <br />predict the quality of water that could be delivered to the Rio Grande. <br /> <br /> <br />As you are aware" Article III of the Rio Grande Compact limits salvaged <br /> <br /> <br />waters which can. be credited to Colorado as a part of its compact require- <br /> <br />ments. The perc;ent of sodium ions must be less than 45 when the TDS <br /> <br />exceeds 350 p/m in the salvaged water. <br /> <br />The act authorizes the Secretary to improve the Rio Grande channel as a <br /> <br /> <br />part of the Closed Basin Division. This improvement will begin at the <br /> <br /> <br />mouth of the Main Conveyance Channel and extend to the Colorado-New <br /> <br />Mpxir.o st;:at.P. liMP. Tt will ARAlIYP r~Try1"! AA1vAgFi!d W.qt"PTR in t'he 'Rio <br /> <br />Grande without flooding of surrounding lands and minimize losses of <br />salvaged waters. We have scheduled approximately 10 months for the <br />channel rectification studies of the definite plan report, because the <br /> <br /> <br />channel rectification was included in the project au~horization on the <br /> <br /> <br />basis of very preliminary and brief consideration. No report of this <br /> <br /> <br />consideration was published. We do not know the 'capacity of the river <br /> <br /> <br />to accept the salvaged waters, but expect that very little channel <br />rectification work will physically be done on the river. Channel <br />rectification implies a lesser amount of -work than channelization, and <br /> <br /> <br />we expect to keep all river channel modifications to the absolute mini- <br /> <br />mum. We anticipate a minimum number of Kellner-type jetties would be <br /> <br /> <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.