Laserfiche WebLink
<br />I' <br />1 <br /> <br />,090611 <br /> <br />. <br /> <br />. <br /> <br />anticipate continuous monitoring of the water levels to gain a back- <br /> <br />ground of inforuation on which to base the project operation. <br /> <br />Another item of high priority is to drill and pump test wells. This <br /> <br />would involve pump testing from wells constructed specifically for this <br /> <br />purpose which hopefully could later be used for production wells. The <br /> <br />pump tests will determine the aquifer characteristics such as trans- <br /> <br />missivity, specific yield, storage coefficient, etc., for the aquifer. <br /> <br />Specific yield is the amount of water yielded from water-bearing material <br /> <br />by gravity drainage. The storage coefficient is the volume of water an <br /> <br />aquifer releases from or takes into storage, per unit surface area of <br /> <br />the aquifer, per unit change in head. For unconfined aquifers it is <br /> <br />virtually equal to specific yield. These values can be determined by <br /> <br />continuous pumping at a constant rate over a period of several days and <br /> <br />'-... ---------_..,..... <br />"') .................... .............J <br /> <br />c~~z~;i~g ~~=~~;~t~on ~~ll~ ~~~=~~~~i~o t~= <br /> <br />.......nw"Ioa,.:r <br />'-"'-r -- <br /> <br />well to measure drawdowns. In connection with this testing we wouJ.d <br /> <br />also perform leaky aquifer tests. These tests are simply pump tests <br /> <br />with observation wells also in the artesian aquifer. These tests ~7ill <br /> <br />measure the effect on t~'.e artesian aquifer from pumping the shallow <br /> <br />aquifer. We do not expect that waters of the artesian aquifer will be <br /> <br />affected by pumping from the shallow aquifer. About the middle of <br /> <br />fiscal year 1976 we would also initiate water quality monitoring from <br /> <br />the observation well network. This monitoring will be continued through- <br /> <br />out the preconstruction, construction and operation phases of the Closed <br /> <br />Basin Division. <br /> <br />9 <br />