My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC01267
CWCB
>
Water Supply Protection
>
Backfile
>
13000-13999
>
WSPC01267
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:10:38 AM
Creation date
10/9/2006 2:39:33 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8040.950
Description
Section D General Studies - General Water Studies
State
CO
Basin
Statewide
Date
1/1/3000
Author
Unknown
Title
Colorado Water Study - Engineer Resumes - Volume II - M-Z
Water Supply Pro - Doc Type
Data
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />l <br /> <br />001454 <br /> <br />PAU L N, OTTER <br /> <br />1'\' <br />0\(-::> (/./ <br />/" '\ \.1\ (j <br /> <br />PROFESSIONAL RECORD <br /> <br />EDUCATION <br /> <br />8,S. Civil E'lJineering, University of Michigan, 1960. <br /> <br />SPECIALTIES <br /> <br />Design of Irrigation Systems * Planning Mlltipurpose Water Resources Development <br />Projects * Construction Contract Administratian * Cost atimates * Land Reclamation <br /> <br />, -I <br />I <br /> <br />EXPERIENCE <br /> <br />~ <br />I <br />~ <br /> <br />Chief Planni'lJ Engineer, E'lJineering Consultants, Inc., Denver, Colorado (1974 to date) <br />Responsible for review, formulation and coordination of planning activiti es for numerous <br />engineeri'lJ projects associated with development of land and water resources. Duties include <br />field investigations, analysis of data, irrigation and electrical power studies, economic <br />studies, preporation of preliminary designs, cost estimates and financial analyses. Major <br />projects include: ' <br /> <br />Citancluy Project, Indonesia. Participoted in project formulation, review of <br />reports, review of preliminary designs and economic studies, review of final <br />design criteria, first duri'lJ feasibility and later during final design of the <br />Master Plan for the Citanduy Basin Development. The project includes flood <br />control facilities, irrigation and drainage facilities, tidal control and recla- <br />mation of brackish swampland for rice production and potential hydropower <br />developments. <br /> <br />Central Luzon Project, Philippines. Responsible for conceptual planning and <br />review of the comprehensive basin plan of optimizing development of land and <br />water resources in the 18,000 square kilometer area. The project includes <br />flood control, irrigation, drainage, hydropower, and land reclamation. <br />Major project features include twelve potential dam sites and irrigation service <br />for 9,000 square kilometers. Conducted training program for Philippine engineers <br />involved in layout, preliminary design and economic evaluation of dams. <br /> <br />~ <br />) <br />J <br />I <br /> <br />~ <br />I <br /> <br />Grous Leader, Harza E'lJineering Company, Chicago, Illinois (1967-1974). Duties <br />inclu ed supervision of planni'lJ, and design for water resource development projects. <br />Major projects and responsibilities included: <br /> <br />Project Manager responsible for pre-feasibil ity report on development of <br />storage reservoirs on the Powder River in Wyoming. Responsibilities in- <br />cluded selection of four dam sites, determini'lJ reservoir yields compatible <br />with existi'lJ water rights and inter-state agreements, dam types, heights <br />and layouts, extensive sediment analyses, and water yield-cost relation- <br />ships. (One year assignment) <br /> <br />~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.