Laserfiche WebLink
<br /> :> <br /> JUDe 1970 <br />.. <br /> TABULATION OF QUANTITIES <br /> NORTON DRAIN PROJECT <br />Struct. & Loc. Description Quanti ty Unit Unit Cost Extension <br />WEST BRANCH <br />A 24" ~ CMP 36 1.f. B.OO 2BB.00 <br />1 20+00 24" drop structure 1 each 1000.00 1,000.00 <br />2 28+B5 24" ~ CM? 90 1.f. B.OO 720.00 <br />2A <br />3 52+00 24" ~ CMP 172 1.f. 8.00 1,376.00 <br />4 52+42 <br />4A 210" ~ CMP 36 1.f. B.OO' 2BB.00 <br />loB 24" ~ CM? 36 1.f. B.OO 2B8.00 <br />5 9B+25 24" ~ CM? 78 1.f. 8.00 6210.00 <br />6 1010+33 24" ~ CM? 144 1.f. B.OO 1,152.00 <br />7 104+80 <br />8 130+96 24" ~ drop structure 1 each 1000.00 1,000.00 <br /> 1~," ~ fie Id drops B each 270.00 2,160.00 <br /> Excava tion 7B,459 c.y. 0.25 19,614.75 <br /> Riprap 49 c.y. 10.00 490.00 <br /> Subtota 1 for West Branch 29,000.75 <br /> <br />MAIN BRANCH <br />9 5B+I0 48" ~ CM? 120 1.f. 15.00 1,BOO.00 <br />9A 2 miter 600 bend 48" ~ CMP 2 each 337.50 675.00 <br />9B 48" ~ CMP x-ing (Bankers Life) 72 1.1. 15.00 1,080.00 <br />10 71+82 18" ~ Smooth FIo x-ing 70 1.f. 9.50 66'~ . 00 <br /> Concrete 1.3 c.y. 100.00 130.00 <br /> Cutoff collars 1 pair 70.00 70.00 <br />11 137+10 18" ~ Smooth FIo x-ing 71 l.f. 9.50 674.50 <br /> Concrete 1.3 c.y. 100.00 130.00 <br /> Cutoff collara 1 pair 70.00 70.00 <br />12 159+06 18" ~ Smooth FIo x-ing 64 1.f. 9.50 60B.00 <br /> Concre te 1.3 c.y. 100.00 130.00 <br /> Cutoff collars 1 pair 70.00 70.00 <br />13 173+44 48" ~ CMP 200 l.f. 15.00 3,000.00 <br />13A 2 miter 450 bend 108" ~ CM? 1 each 300.00 300.00 <br />13B 1 miter 11 0 bend 48" ~ CMP 1 each 175.00 175.00 <br />14 180+00 Double 48" ~ drop structure 1 l'. s. 2300.00 2,300.00 <br />15 204+82 48" ~ CMP 128 1.1. 1~L 00 1,920.00 <br />15A 48" ~ CM? x-ing (Johneon) 72 l.f. 15.00 1,080.00 <br />16 234+56 Ephraim Waste Ditch x-lngs <br />17 247+57 deleted, pay for 50' - }O"P Smooth Flo <br />IB 252+64 0589 <br />