My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC00755
CWCB
>
Water Supply Protection
>
Backfile
>
13000-13999
>
WSPC00755
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:06:53 AM
Creation date
10/9/2006 2:20:06 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8530.300
Description
Rio Grande Basin-Water User Groups and Conservancy Districts-Rio Grande Water Conservation District
State
CO
Basin
Rio Grande
Water Division
3
Date
7/20/1970
Title
WCD-Rio Grande Water Conservation District-Corres Reports etc-1967-82-Norton Drain Project Summary Report-Rock Creek Channelization Project Preliminary Engineering Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />4 <br /> <br />",? <br /> <br />SUMMARY OF CONSTRUCTION COSTS <br />NORTON DRAIN PROJECT <br /> <br />lli1'! Description Quanti ty !l!!i Unit Cost Extene10n <br />1 Excavation 362,850 c.y. 0.25 90,712.50 <br />2 Drop structure, 24" 2 each 1000.00 2,000.00 <br />3 Drop structure, 48" 4 each 2300.00 9,200.00 <br />4 Check structure, 48" 2 each 2400.00 4,800.00 <br />5 High~y crossing 1 1.e, 4800.00 4,800.00 <br />6 Reinforced concrete 13.2 c.y. 100.00 1,320.00 <br />7 Riprep 1,082 c.y. 10.00 10,820.00 <br />8 48" CMP culverts 1,506 1.f. 15.00 22,590.00 <br />9 24" CMP culvsrts 612 1.f. 8.00 4,896.00 <br />10 18" steel pipe 271 l.f. 9.50 2,574.50 <br />12 24" steel pipe 373 1.f. 10.00 3,730.00 <br />14 18" cutoff collars 4 pair 70.00 280.00 <br />16 24" cutoff collars 4 pair 70.00 280.00 <br />18 Well ,protection 2 1.8. 1000.00 2,000.00 <br />19 450 bend, 48" CMF 1 eaoh 300.00 300.00 <br />20 11to bend, 48" CMF 1 each 175.00 175.00 <br />21 600 bond, 48" C}W 2 each 337.50 675.00 <br />22 12" eMF field drops 48 each 270.00 12,960.00 <br />23 12" CMP vert hwy drops 2 each 100.00 200.00 <br />24 12" CMF ext to field drops 424 1.f. 6.00 2,544.00 <br /> CONSTRUCTION TO~L $ 176,857.00 <br /> Administrative costs 3,000.00 <br /> Legal costs 2,638.00 <br /> Engineering costs 18,862.00 <br /> PROJECT T(J"'AL $ 201,357.00 <br /> <br />Financial participation in this project is divided as follows: <br />Agricultural Stabilization & Conservation Service 69.03~ <br />Colorado Water Conservation Board 22.35 <br />Rio Grande Water Conservation District 8.62 <br /> <br />$ 139,000.00 <br /> <br />45,000.00 <br />17,357.00 <br />$ 201,357.00 <br /> <br />PROJECT TOTAL 100.00~ <br /> <br />0590 <br />
The URL can be used to link to this page
Your browser does not support the video tag.