My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC00755
CWCB
>
Water Supply Protection
>
Backfile
>
13000-13999
>
WSPC00755
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:06:53 AM
Creation date
10/9/2006 2:20:06 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8530.300
Description
Rio Grande Basin-Water User Groups and Conservancy Districts-Rio Grande Water Conservation District
State
CO
Basin
Rio Grande
Water Division
3
Date
7/20/1970
Title
WCD-Rio Grande Water Conservation District-Corres Reports etc-1967-82-Norton Drain Project Summary Report-Rock Creek Channelization Project Preliminary Engineering Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.~~ <br /> <br />\ <br />'" <br /> <br />3 <br /> <br />.. <br /> <br />At the beginning of the project it was felt that private land ownera <br />should provide field drops to accommodate their waets water. When <br />additional money became available the District decided to include <br />field drains in the scope of the project and approximately 50 vere <br />installed by the conttactor, as vere six additional vehicle crosding <br />structures. <br /> <br />3. Costs <br /> <br />Costs are shown by item and by location on the next three pages. It <br />is difficult to assign a value to the time, energy and effort spent <br />by members of the Board of Directors. Three members, Robert C. Taylor, <br />Dale Sovards and Kelly Sowards, vere appointed as a committee to <br />handle urgent items of business which came up between regular meetings <br />of the Board of Directors, and much demand vas made on their time, <br />particularly. <br /> <br />Legal, administrative and engineering costs are approximate as other <br />studies, projects and functions were being carried on concurrently <br />and a distinct division between projects is impossible to make. A <br />further breakdown of engineering costs is given below: <br /> <br />Preliminary feasibility study <br />Field survey for and preparation of filing map <br />Design and preparation of plans and specifications <br />Revisions, bidding, calculations for new profile <br />Surveys and calculations for rights of way <br />Construction staking and route changes <br />Construction supervision and inspection and reports <br /> <br />Total Engineering Costs <br /> <br />II 1,"69 <br />1,590 <br />5,33" <br />2,536 <br />2,,.8,. <br />2,297 <br />3,150 <br />$18,860 <br /> <br />Legal costs are distributed over the various phases of the project <br />as follo"'81 <br /> <br />Right of vay acquisition <br />Contracts <br />Contacts and conferences for refinancing of <br />project <br />All other related mattera <br /> <br />Total Legal Costs <br /> <br />1,538 <br />300 <br /> <br />331 <br />,.69 <br />$ 2,638 <br /> <br />Funds, other than those of the District, came from the following <br />sources: <br />A.S.C.S. initial grant II 8",000.00 <br />A.S.C.8. supplemental grant 55,000.00, 0$9, <br />Total A.S.C.8. Grants 6139,000.00 <br />Colorado Water Conservation Board <br /> Initial grant 25,000.00 <br /> Supplemental grant 20,000.00 <br />Total State Grants $ "5,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.