Laserfiche WebLink
<br /> 6 <br /> Jun!l 1970 <br />/~ Norton Drain Project (cont.) <br />- <br />Struct. & Loc. De8cription Quanti ty Unit Unit Cost Extension <br />19 266+40 48" CM? llwy x-ing 1 1.s. 4800.00 4,800.00 <br />19A Double 48" ~ check structure 1 1.s. 2400.00 2,400.00 <br /> (Rasmussen) <br />20 307+77 24" ~ Smooth Flo x-ing 72 1.f. 10.00 720.00 <br /> Concrete 1.6 c.y. 100.00 160.00 <br /> Cutoff collars 1 pair 70.00 70.00 <br />21 309+45 Double 48" ~ check structure 1 1. s. 2400.00 2,400.00 <br /> 48" ~ CMP 46 l.f. 15.00 690.00 <br />22 319+82 48" ~ CMP 148 1.f. 15.00 2,220.00 <br />23 333+00 Double 48" ~ drop structure 1 1. s. 2300.00 2,300.00 <br />24 245+97 48" ~ CMP 92 1.f. 15.00 1.380.00 <br />24A 48" P. CMP (Barr) 80 l.f. 15.00 1,200.00 <br /> 24" ;Ii Smooth Flo x-ing 94 1.f. 10.00 940.00 <br /> Concrete 1.6 c.y. 100.00 160.00 <br />25 359+29 24" ~ Smooth Flo x-ing 74 1.f. 10.00 740.00 <br /> Concrete 1.6 c.y. 100.00 160.00 <br /> Cutoff collars 1 pair 70.00 70.00 <br />26 378+44 Double 48" ~ drop structure 1 1.s, 2300.00 2,300.00 <br />27 398+12 24" ~ Smooth Flo x-ing 60 1.f. 10.00 600.00 <br /> Concrete 1.6 c.y. 100.00 160.00 <br /> Cutoff collars 1 pair 70.00 70.00 <br /> 24" ~ CMF extension 20 1.f. 8.00 160.00 <br />27A 48" ~ CMP x-ing (Christensen) 80 1.f. 15.00 1,200.00 <br />28 411+39 24" ~ Smooth Flo x-ing 73 1.f. 10.00 730.00 <br /> Concrete 1.6 c.y. 100.00 160.00 <br /> Cutoff collars 1 pair 70.00 70.00 <br />29 427+00 Double 48" ~ drop structure 1 1.8. 2300.00 2,300.00 <br />29A 48" ~ CMP x-ing (HOlman) 72 1.f. 15.00 1,080.00 <br />30 444+51 18" Smooth Flo x-ing 66 1.f. 9.50 627.00 <br /> Conc re te 1.3 c.y. 100.00 130.00 <br /> Cutoff collars 1 pair 70.00 70.00 <br />31 450+00 48" ~ CMP 256 1. f. 15.00 3,840.00 <br />32 451+53 48" ~ CMP 140 l.f. 15.00 2,100.00 <br /> 12" ~ field drops 40 each 270.00 10,800.00 <br /> 12" ~ vert borrow pit drops 2 each 100.00 200.00 <br /> Excavation 284,391 c.y. 0.25 71,097.75 <br /> Ri pra p 1,033 c.y. 10.00 10,330.00 <br /> 12" ~ CMP pipe extend on. 424 1.f. 6.00 2,544.00 <br /> Wall protection 2 each 1000.00 2,000.00 <br /> Subto ta I for Main Branch 147,866.25 <br /> Construction Total for Project 8 176,857.00 <br /> 0588 <br />