My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC00750
CWCB
>
Water Supply Protection
>
Backfile
>
13000-13999
>
WSPC00750
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 7:50:56 AM
Creation date
10/9/2006 2:20:01 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8045
Description
Section D General Studies-Federal Projects-General
Date
2/2/1981
Author
William Paddock
Title
Azure Sheephorn Reservoir Project-Corres Reports etc-1980-1987-City of Golden and Vidler Water Tunnel Company-Petition for the Imposition of Certain Conditions on Any Preliminary Work
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />) <br /> <br />. <br /> <br />. <br /> <br />. , <br /> <br />Gore Canyon Power Station <br />Gore Reservoir <br />Blue River Pipel ine <br /> <br />In order to avoid harassment and stress to wintering deer <br />or elk herds in these areas it is requested that the follow- <br />ing condition be imposed on any prel iminary permit issued <br />to appl icants. <br /> <br />~~nditign No. I: No mechanized field work or blasting shall <br />be done at the (above 1 isted) sites from November 15th of <br />any year until May 15th of the following year. <br /> <br />The imposition of this condition will work no substan- <br />tial hardship on applicants because it only prohibits blast- <br />in9 and mechanized field work. Non-disruptive investigations <br />and data collection could still be carried out in these <br />areas subject to the remaining conditions. Additionally, <br />during much of the time period in question many of the restricted <br />areas are snowbound and appl icants probably dO not contem- <br />plate working in those locations at those times. <br /> <br />Elk calving takes place in the vicinity of the proposed <br />Silver Creek Tunnel and Pipeline and the proposed Bear Tunnel. <br />In order to avoid unnecessary disturbances during this impor- <br />tant time periOd it is requested that the following condition <br />be placed on any preliminary work permit issue to applicants. <br /> <br />~gud111QD_~~: No mechanized field investigations or <br />blasting shall be carried out in the area of the proposed <br />Silver Creek Tunnel and pipeline or the proposed Bear Tunnel <br />from June 1st to July 15th of any year. <br /> <br />~f~Il~~_alB~_fBOlf~Il~~OlIlO~S <br /> <br />Nesting birds, like elk and deer, can be subject to <br />excessive stress. In birds the excessive stress which can <br />result from activities of man is frequently manifested by <br />desertion of the nest. Such desertion results in loss of <br />young, disruption of breeding patterns and a consequent <br />decline in species population. This problem is particularly <br />severe with hawkS, falcons and 901den eagles. To prevent <br />unnecessary disturbance to nesting bird species in Colorado <br />it is requested that the following conditions be imposed <br />on any preliminary work per~jt issued in this matter. <br /> <br />-3- <br /> <br />0968 <br />
The URL can be used to link to this page
Your browser does not support the video tag.