Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />TABLE 2 <br /> <br />Moon Lake-STaley Mine Pipeline <br /> <br />o to 48,240 AF <br /> <br />eo i es Proj ect <br /> <br />5,020 AF <br /> <br />Flattops Project <br /> <br />-0- <br /> <br />'. <br /> <br />Highland DiTch <br /> <br />-0- II <br /> <br />Sti I Iwater Reservoir <br /> <br />900 AF <br /> <br />Phillips Ditch Expansion <br /> <br />30 AF <br /> <br />Bruce Baker Ditch <br /> <br />-0- <br /> <br />Wheeler Ditch Expansion <br /> <br />550 AF <br />-0- <br /> <br />Two Small Non-Consumptive Rights <br /> <br />Three Sma I I Irrigation Rights <br /> <br />70 AF <br /> <br />TOTAL <br /> <br />6,570 to 54,850 AF <br /> <br />II <br /> <br />Effect, if any, would be to increase Rangely Project yields. <br /> <br />Due to the shifting points of control in a large stream system <br /> <br />resulting from yarying combi~~tions of diversion demands, minimum <br /> <br /> <br />streamflow requirements and poinTS of reTurn of flows from <br /> <br />irrigation, municipal and non-consumptive uses, it is difficult or <br /> <br />impossible to predict the effects of changing the prototype situa-' <br /> <br />tion without further simulation runs of the model. Accordingly, it <br /> <br />is emphasized that the effeCTS on the Rangely Project due to <br /> <br />development of these senior rights which were not operated are our <br /> <br />best estimates based on judgment and interpretation of the computed <br /> <br />results of the simulation studies. <br /> <br />0245 <br /> <br />- 14 - <br /> <br />_, r;., <br />, <br />" <br /> <br />..\ <br />