Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />If the return flows from the ~bon Lake-Staley Pipeline were returned <br /> <br />to the river upstream of the Rangaly Project features, the maximum <br /> <br />depletion of the Rangely Project yield due to development of all <br /> <br />- <br />senior rights would average only about 6,570 AF per year. The <br /> <br />total of 54,850 AF per year reduction in yield would be the average <br /> <br />maximum reduction if the Moon Lake-Staley Mine Pipeline were developed <br /> <br />to its full senior right diversion entitlewent of 125.2 cfs, if <br /> <br /> <br />60,000 AF of storage were provided (which would only provide a con- <br /> <br />tinuous supply of about 105 cfs) and if all of the return flows were <br /> <br />to bypass the Rangely Project features. <br /> <br />Competition between the senior rights discussed in this report, <br /> <br />and the absence of sufficient streamflows to meet all of the demands <br /> <br />of all rights could result in a lesser net effect on the Rangely <br /> <br />Project yields. <br /> <br />'. <br /> <br />0'24" <br /> <br />..... <br />..... <br /> <br />""....1 \\ <br /> <br />- 15 - <br />