My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC00423
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSPC00423
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:49:39 AM
Creation date
10/9/2006 2:09:44 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.720
Description
Colorado River Basin Organizations-Entities - US Bureau of Reclamation
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
7/13/1944
Author
CWCB
Title
Statement of the State of Colorado - Concerning the Status-Progress-and Planning of Water Projects Which Use or Contemplate the Use of Water of the Colorado River System in the State of Colorado
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />0[,1463 <br /> <br />-5- <br /> <br />I - \/ESTERN COIDRAOOs PROGRESS <br /> <br />9. ContElllplated Projeots (Cont1d.)1 <br /> <br />power purposes in Unoompahgre (Gurmison) River basin; estimated <br />oost $3.!J50.000. <br /> <br />. <br /> <br />(i) <br /> <br />Paonia Projeot. Minnesota Division. to be constructed for irri- <br />gation in North Fork ( Glmnison) basin; 'estimated. cost $797.000. <br /> <br />(j) Grand County ditoh reoonstruotion, a s part of Colorado-Big Thomp- <br />son Project. in Colorado River basin. limit~ng cost $300.000. <br /> <br />(k) West Divide Project. to be construoted for irrigation in Colo- <br />rado River basin; estimated cost $901,000. <br /> <br />(1) Hunter Mesa Project. to be constructed for irrigation in Colo- <br />rado River basin; estimated cost $1,500.000. <br /> <br />(m) Silt Project. to be constructed for irrigation in Colorado River <br />basin; estimated oost $1,245.000. <br /> <br />(n) Collbran projeot. to be constructed for irrigation in Colorado <br />River basin; estimated cost $1.632,000. <br /> <br />(0) Baggs Project. to be construeted for irrigation in Little Snake <br />(Yampa) River basin; estimated (Colorado share of total) cost <br />$5.000.000. <br /> <br />(p) ~lisoellaneous irrigation projects in Western Colorado. princi- <br />pally for irrigation; estimated oost $5.000.000. <br /> <br />I - WESTERN COIDRADCl! PLANNING <br /> <br />10. projeot study areas in Western Colorado under preliminary and general <br />investigation. with notes as to named and unnamed vater projects to be oon- <br />sidered for future construotion upon completion of detailed studies. design <br />plans and estimated oosts. <br /> <br />SAN JUAN-DOIDRES BASIN <br />(1) Upper San Juan (Water Districts 29 and 46). <br /> <br />(a) Main San Juan (conflict between looal needs and exportation poss- <br />ibilities) . <br /> <br />(b) Other Sub-Areasl Piedra, Rio Blanoo. Navajo. <br /> <br />(2) Pine River (W. D. 31). - conflict between local needs and exporta- <br />tion possibilities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.