My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC00423
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSPC00423
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:49:39 AM
Creation date
10/9/2006 2:09:44 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.720
Description
Colorado River Basin Organizations-Entities - US Bureau of Reclamation
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
7/13/1944
Author
CWCB
Title
Statement of the State of Colorado - Concerning the Status-Progress-and Planning of Water Projects Which Use or Contemplate the Use of Water of the Colorado River System in the State of Colorado
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Gin.no <br /> <br />-6- <br /> <br />I - WESTERN COIDRADO. PUHNING <br /> <br />10. Future Projects (Cont'd). <br /> <br />(3) Animas River (W. D. 30), -" reservoirs on upper Animas for regula- <br />tion and power; flood control for valley above Durango; trans- <br />basin diversion to La Plata River. <br /> <br />. <br /> <br />(4) La Plata River (W. D. 33), - see contemplated La Plata Project. <br /> <br />(a) Areas not served by Long Hollow Reservoir. <br /> <br />(b) Possibilities of importations from Animas to La Plata and Do- <br />lores Rivers. <br /> <br />(5) Mancos River (part W. D. 34), - see Mancos Res. under construction. <br /> <br /> <br />(6) MoElmo Creek (part ~. D. 32), - see constructed Ground Hog Reser- <br /> <br />voir. <br /> <br />(a) Additional supplies from Dolores River (W. D. 69). <br /> <br />(b) Arable lands of Southern ute Indian Reservation, - conflict <br />with arable lands of Montezuma Creek (Dolores-Dove Creek Pro- <br />ject) . <br /> <br />(7) Dove Creek Area (part \\. D. 32), - see contemplated Do lores-Dove <br />Creek Project. <br /> <br />(8) Upper Dolores (l{. D. 69 and part l{. D. 34), - see constructed <br />Ground Hog Reservoir. <br /> <br />(a) Reservoir possibilities on other upriver tributaries; and <br />on Disappointment and Gypsum Creeks. <br /> <br />(9) Paradox Valley (W. D. 61). <br /> <br />. <br /> <br />(a) East Paradox Project. <br />(10) San Miguel (H. D. 60), - see contemplated San fuguel Projects. <br />(a) lily Lands, Sprodlin Park and other project. <br /> <br />(b) Extension of Nucla ditch, with regulation by tributary re- <br />servoir. <br /> <br />(11) Lower Dolores (W. D. 63). <br /> <br />GUNNISON RIVER BASIN <br /> <br />(12) Upper Gunnison (part W. D. 59 above Gunnison), - see constructed <br />Taylor Park Reservoir and contemplated Gunnison-Arkansas Project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.