My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC00423
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSPC00423
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:49:39 AM
Creation date
10/9/2006 2:09:44 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.720
Description
Colorado River Basin Organizations-Entities - US Bureau of Reclamation
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
7/13/1944
Author
CWCB
Title
Statement of the State of Colorado - Concerning the Status-Progress-and Planning of Water Projects Which Use or Contemplate the Use of Water of the Colorado River System in the State of Colorado
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />001,408 <br /> <br />-4- <br /> <br />I - WESTERN COlDRAOOI PROGRESS <br /> <br />U. S. Bureau of Reclamation (C. O. Labor), to provide supplemen- <br />tal irrigation supplies (and domestic supplies) for Mesa Verde <br />National Park; - estimated cost $1,370,000. <br /> <br />. <br /> <br />(b) Sprin~ Creek Reservoir, on a tributary of North Fork Gunnison <br />River, is'part of the authorized U. S. B. R. paonia Project - <br />Fire Mountain Division, to provide supplemental irrigation sup- <br />plies; - estimated cost $1.373,000 including appurtenant works. <br /> <br />(c) Shadow Mountain Reservoir is part of the U. S. B. R. Colorado- <br />Big Thompson Project, under construction to regulate Grand Lake <br />levels and diversions into Continental Divide Tunnel. <br /> <br />(d) Grenby Reservoir is part of U. S. B. R. Colorado-Big Thompson <br />Project, to be constructed on the Colorado River, primarily for <br />purposes of streamflow regulation. and water conservation. <br /> <br />9. Water projects in Western Colorado under investi~tion or reported on <br />by U. S. Bureau of Reclamation. which may be classified as contemplated for <br />post-war construction, include among othersl <br /> <br />(a) Several reservoirs on Eagle, Blue and Williams Fork rivers and <br />their tributaries (as parts' of the contemplated Blue-South Platte <br />Project) to be 'constructed for regulation, conservation, replace- <br />ment and power purposes. <br /> <br />(b) Several reservoirs on tributaries of Gunnison and Roaring Fork <br />Rivers (as parts of contemplated Gunnison-Arkansas Project) to be <br />constructed for regulation, conservation, replacement and power n <br />purpos es . <br /> <br />(c) Pine River ditch system, required to distribute waters of recent- <br />ly constructed Vallecito Reservoir, to oe constructed in San Juan <br />River basin, estimated cost $1,370,000. <br /> <br />(d) Florida l1esa Project, reservoir and ditch system for irrigation <br />purposes in San Juan River basin; estimated cost $2,500,000. <br /> <br />(e) La Plata Project, includes Long I~llow reservoir for supplement- <br />al irrigation in La Plata River valley, and Stateline reservoir <br />for flood control and regulation (under Interstate Compact), to <br />be constructed in San Juan River basin, estimated cost $',800,000. <br /> <br />(f) Dolores-Dove Creek Proiect, including reservoir on Dolores River, <br />outlet works, tunnel. and distribution system to be constructed <br />in San Juan River basin; estimated cost of $11,600,000. <br /> <br />(g) San Hi~uel Project, to be constructed for irrigation in Dolores <br />RiV'er basin; estimated cost of $1,500,000. <br /> <br />(h) Montrose Power i'ro.iect, to be cOnstructed for flood control and <br />
The URL can be used to link to this page
Your browser does not support the video tag.