Laserfiche WebLink
<br />------------------- <br /> <br /> NNMP will protect agricultural lands. Schedule during 2003. <br /> construction during no-production time to <br /> eliminate impacts. <br />11 . Recreation Commitments <br />11-1 Reclamation will pursue a pumping regime to 2000 FSEIS 5-17 Operation procedures will be included in the <br /> reduce adverse effects on boating in the AR, such standard operation procedures for the DPP, <br /> as altering pumping regimes during <br /> competitivelother events to minimize affect of <br /> pumping on the event. <br />11-2 Reclamation will provide funding (not to exceed 2000 FSEIS 5-17 Reclamation is working with La Plata County and <br /> $500,000) for the acquisition of public access at a the City of Durango to put in place an agreement <br /> minimum of two points on the Animas River to help fund two public access point on the <br /> between the High Bridge and Basin Creek. Animas River, one at the High Bridge and one <br /> located where La Plata County is constructing a <br /> new bridge across the Animas River south and <br /> west of the Home Depot store, <br />12 - Socioeconomic Commitments <br />12-1 No environmental commitments are made for 2000 FSEIS 5-17 <br /> Socioeconomic Resources <br />13 - Land Use Commitment <br />13-1 No environmental commitments are made for Land 2000 FSEIS 5-18 <br /> Use <br />14 - Hazardous Materials Commitments <br />14-1 The DPP will be designed to minimize disturbance 2000 FSEIS 5-18 Areas of known high levels of contamination <br /> of contaminated materials, Procedures will be put were isolated and not disturbed during <br /> in place for radiological monitoring of excavated construction, <br /> soils and groundwater encountered and that <br /> remedial procedures are planned in advance to Requirements for disposal of contaminated soil <br /> <br />21 <br /> <br />o <br />c:,) <br />c;..) <br />CJ:) <br />CJ <br />=- <br />